GCB-Final | 2/15/2012 | 2/16/2012 | 2/16/2012 | A | PASS |
Mike Jordan
|
|
|
Kris @ ###-####. All issues have been resolved.
|
GCB-Final | 2/14/2012 | 2/15/2012 | 2/15/2012 | A | FAIL |
Mike Jordan
|
|
|
Kris @ ###-####. Needs to provide additional vertical grab bar in ada restroom, provide mirror at required height, lower sink and horizontal grab bars so as to meet ada requirements, provide ada compliant hardware at ada restroom, remove the keyed locking hardware from back door. Provide ada compliant pos.
|
Plan assigned to (SRZ) | 9/14/2011 | 9/14/2011 | 10/7/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/7/2011 | | 10/7/2011 | | PASS |
Sam Zahorka
|
|
|
Verified Fire Review passed for Fire Flow reasons and material class is not a hazardous liquid needing a control area separation.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 10/7/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2011 | | 9/22/2011 | | PEND |
Sam Zahorka
|
|
|
|
1st review completed | | | 9/22/2011 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 9/13/2011 | | DONE |
|
|
|
|