Permit Information
Permit NumberGCB11-00092
StatusFinaled
Name ASIN GENERAL CONTRACTORS
Site Address 445 E THURMAN MILL
Project NameBLD2011-00091
Customer Number 
ePlanReviewNo
Description
**1/12/2012 PLAN MODIFICATION TO INCLUDE: MIRROR THE PROPOSED SINGLE FAMILY DWELLING ON THE LOT AS PER THE APPROVED PLANS. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. SRZ *** To construct a one story, 1,614 square foot, Single Family dwelling with a 476 square foot attached garage, a 120 square foot covered rear patio, and a 24 square foot covered front porch. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. Case No. 05-10-0330A. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/12/20123/13/20123/13/2012APASS
DetailsMike Jordan
Scott @ ###-####. All issues were resolved card was signed.
GCB-Final3/2/20123/5/20123/5/2012AFAIL
DetailsMike Jordan
Scott @ ###-####. Provide and post blower door test results and post the required energy cert. Correction notice was posted.
Plan assigned to (SRZ)1/11/20121/11/20121/18/2012 DONE
DetailsSam Zahorka
Plan Mod.
Routing - PLAN CHECK1/17/2012 1/18/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/18/2012 DONE
DetailsSam Zahorka
CHANGE STATUS TO (ISS)  1/18/2012 DONE
Routing - Mechanical Review1/12/2012 1/17/2012 PASS
DetailsTroy James
GCB-Energy1/11/20121/12/20121/12/2012APASS
DetailsDave Hannah
Scott @ ###-####PM Inspection
Routing - PLAN CHECK1/12/2012 1/12/2012 PASS
DetailsSam Zahorka
GCB-Framing1/10/20121/11/20121/11/2012APASS
DetailsMike Jordan
Scott @ ###-####. ok to insulate.
Plan resubmittals received  1/11/2012 DONE
CHANGE STATUS TO (REV)  1/11/2012 DONE
plan modification received - assigned to SRZ
GCB-Shearwall12/28/201112/29/201112/29/2011APASS
DetailsDave Hannah
contact Scott ###-#### ok to cover ext
GCB-Fndatn/slab ins/fld vent12/2/201112/5/201112/5/2011APASS
DetailsMike Jordan
Shane @ ###-####
GCB-Footing12/1/201112/2/201112/2/2011APASS
DetailsDave Hannah
Ryan @ ###-#### PM Inspection
Plan assigned to (SRZ)11/4/201111/4/201111/22/2011 DONE
DetailsSam Zahorka
1st review completed. Need corrections.
PLANS/APPL TAKEN TO FRONT DESK  11/22/2011 DONE
DetailsSam Zahorka
Issue and Courier  11/22/2011 DONE
Plan resubmittals received  11/21/2011 DONE
1st review completed  11/7/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK11/4/2011 11/7/2011 FAIL
DetailsSam Zahorka
Application received  11/4/2011 DONE
Routing - Mechanical Review11/4/2011 11/4/2011 PASS
DetailsTroy James
CHANGE STATUS TO (REV)  11/4/2011 DONE
permit came over in the ISSUED status - had to change it to REV