GCB-Final | 4/5/2012 | 4/6/2012 | 4/6/2012 | P | PASS |
Mike Jordan
|
|
|
Jeremy @ ###-#### PM Inspection. Structural final ok.
|
GCB-Final | 4/4/2012 | 4/4/2012 | 4/4/2012 | A | FAIL |
Dave Hannah
|
|
|
Jeremy ###-#### needs to fix ada rest room and add sign also need landing for back door
|
GCB-Courtesy | 3/7/2012 | 3/8/2012 | 3/8/2012 | A | PASS |
Mike Jordan
|
|
|
Justin @ ###-####Contractor did not specify inspection type. Interior steel stud framed walls ok.
|
GCB-Framing | 2/22/2012 | 2/23/2012 | 2/24/2012 | A | PART |
Dave Hannah
|
|
|
Justin @ ###-####8 AM Inspection storage space walls ok to cover
|
GCB-Framing | 2/9/2012 | 2/10/2012 | 2/10/2012 | A | PASS |
Dave Hannah
|
|
|
Justin @ ###-####Call to confirmPre-Fab Structure Assembly
|
Routing - PLAN CHECK | 1/31/2012 | | 2/2/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2012 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/2/2012 | | DONE |
|
|
|
plan modification - changed status back to issue
|
Plan resubmittals received | | | 1/31/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/31/2012 | | DONE |
|
|
|
plan resubmittals received
|
GCB-Fndatn/slab ins/fld vent | 1/10/2012 | 1/11/2012 | 1/11/2012 | A | PASS |
Mike Jordan
|
|
|
Jeremy @ ###-####. INspected welded wire mesh and vapor barrier for interior slab on grade.
|
GCB-Stem wall | 12/28/2011 | 12/29/2011 | 12/30/2011 | A | CANC |
Dave Hannah
|
|
|
contact Ed ###-####PM inspection
|
GCB-Fndatn/slab ins/fld vent | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | PASS |
Dave Hannah
|
|
|
Dane @ ###-####AM Inspection Preferred
|
GCB-Footing | 12/23/2011 | 12/27/2011 | 12/27/2011 | A | PASS |
Dave Hannah
|
|
|
###-####
|
GCB-Footing | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | CANC |
Dave Hannah
|
|
|
###-####
|
Plan assigned to (SRZ) | 11/8/2011 | 11/8/2011 | 12/14/2011 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Permit issuance pending the Statement of Special Inspection from the registered design proffessional.
|
Routing - PLAN CHECK | 12/14/2011 | | 12/14/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/14/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/6/2011 | | DONE |
|
|
|
|
1st review completed | | | 11/29/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 11/8/2011 | | 11/29/2011 | | PEND |
Sam Zahorka
|
|
|
Pending Statement of Special Inspection submittal prior to issuance.
|
Plan resubmittals received | | | 11/23/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/17/2011 | | DONE |
|
|
|
|
Application received | | | 11/7/2011 | | DONE |
|
|
|
|