GCB-Final | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Mike Jordan
|
|
|
Bobby @ ###-####. All issues resolved, blower door test results posted. Structural final only ok. No card on site to sign. Can not verify other trades finals at this time.
|
GCB-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | FAIL |
Mike Jordan
|
|
|
Bobby @ ###-#### Call in advance. Provide the blower door test reults and post or the third party inspection airseal check list. Corection notice was posted.
|
GCB-Energy | 5/23/2012 | 5/24/2012 | 5/24/2012 | P | PASS |
Dave Hannah
|
|
|
BOBBY @ ###-#### PM INSPECTION
|
GCB-Shearwall | 5/22/2012 | 5/23/2012 | 5/23/2012 | A | CANC |
Dave Hannah
|
|
|
Blake @ ###-#### AM inspection requested
|
GCB-Framing | 5/23/2012 | 5/23/2012 | 5/23/2012 | A | PART |
Dave Hannah
|
|
|
c/n on site ok to insulate
|
GCB-Shearwall | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Dave Hannah
|
|
|
Blake @ ###-#### strapes added
|
GCB-Shearwall | 5/15/2012 | 5/15/2012 | 5/15/2012 | P | CANC |
Mike Jordan
|
|
|
|
GCB-Shearwall | 5/15/2012 | 5/15/2012 | 5/15/2012 | A | FAIL |
Mike Jordan
|
|
|
Call in advance Blake ###-####. Needs to install floor to floor straps as shown on plans.
|
Plan resubmittals received | | | 5/14/2012 | | DONE |
|
|
|
new acca report
|
Routing - Mechanical Review | 5/14/2012 | | 5/14/2012 | | PASS |
Troy James
|
|
|
resubmitted new acca report
|
GCB-Fndatn/slab ins/fld vent | 5/1/2012 | 5/1/2012 | 5/2/2012 | A | PASS |
Dave Hannah
|
|
|
Chris-###-####
|
GCB-Fndatn/slab ins/fld vent | 5/1/2012 | 5/1/2012 | 5/2/2012 | P | CANC |
Mike Jordan
|
|
|
Chris @###-#### Requested an inspection at 1:00 PM today.
|
GCB-Footing | 4/27/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Mike Jordan
|
|
|
Chris @ ###-#### Afternoon inspection requested.
|
Plan assigned to (SRZ) | 11/9/2011 | 11/9/2011 | 12/13/2011 | | DONE |
Sam Zahorka
|
|
|
1st review completed. waiting for corrections.
|
Routing - PLAN CHECK | 11/23/2011 | | 12/12/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/12/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/6/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/10/2011 | | 11/22/2011 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 11/22/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 11/9/2011 | | 11/10/2011 | | PASS |
Troy James
|
|
|
|
Application received | | | 11/8/2011 | | DONE |
|
|
|
|