Permit Information
Permit NumberGCB12-00003
StatusFinaled
Name Baumgart Construction
Site Address 4825 N GLENWOOD
Project NameBLD2012-00003
Customer Number 
ePlanReviewNo
Description
McDonald's - ***7-2-12 PLAN MODIFICATION TO INCLUDE: INFILL EXISTING EXTERIOR WALL OPENINGS PER PLANS; POUR CONCRETE FOUNDATION AND CONSTRUCT NEW EXTERIOR WALLS PER PLANS; REPAIR EXISTING ROOF AND PROVIDE NEW ROOFING PER PLANS; DEMOLISH PORTIONS OF EXISTING ROOF TRUSSES AND CONSTRUCT NEW PARAPET; INSTALL NEW TRELLIS SYSTEM AND TIE BACKS PER PLANS; ALL WORK PER ENGINEERING, APPROVED PLANS, AND STRUCTURAL INSPECTORS FINAL APPROVALS. *** To remodel an existing 4,693 square foot restaurant per the approved plans. Work to include: Demolition work per plans including completely removing the "Playland" and all of its components; Remodel of existing exterior building facade and exterior finishes; selective interior renovations to increase site drive thru efficiency and ADA accessibility per the plans; related interior finishes in compliance with chapter 8 of the 2009 IBC; and all other work per the approved plans, attached plan review report, and adopted codes. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved. This building is not Fire Sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final9/5/20129/6/20129/6/2012APASS
DetailsDave Hannah
Steve @ ###-####
GCB-Ceiling Grid8/13/20128/14/20128/15/2012APART
DetailsDave Hannah
###-#### ok after elec rough in
GCB-Framing7/31/20128/1/20128/1/2012APASS
DetailsMike Jordan
Dave @ ###-####
AM inspection requested
Framing in front. Remainder of over build north west corner of building ok.
GCB-Framing7/9/20127/10/20127/10/2012APASS
DetailsMike Jordan
Steve @ ###-####. Framing for new exterior soffit and facia at east side of building per bulliten #2.
Issue and Courier  7/3/2012 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)6/29/20126/29/20127/2/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/29/2012 7/2/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/2/2012 DONE
DetailsSam Zahorka
Plan resubmittals received  6/29/2012  
Plan modification
GCB-Framing6/25/20126/26/20126/26/2012APART
DetailsDave Hannah
Steve @ ###-####
Framing for the front of the store. ok to cover front soffit
GCB-Framing6/19/20126/20/20126/20/2012APART
DetailsDave Hannah
Steve @ ###-####ok to cover west side of new roof remodel
Plan resubmittals received  5/29/2012  
Received L1.01 for records update 5-29-12
Plan resubmittals received  2/3/2012  
Received 1 copy of sheet C-0, C-1, C-2 and given to Sam Zahorka
Issue and Courier  1/26/2012 DONE
Plan assigned to (SRZ)1/9/20121/9/20121/25/2012 DONE
DetailsSam Zahorka
1st review completed.
Routing - PLAN CHECK1/25/2012 1/25/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/25/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK1/9/2012 1/19/2012 FAIL
DetailsSam Zahorka
1st review completed  1/19/2012 DONE
DetailsSam Zahorka
Telephone call  1/19/2012 DONE
DetailsSam Zahorka
Left a message for the architect Ron Henry.
Application received  1/6/2012 DONE