GCB-Final | 8/31/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Mike Jordan
|
|
|
Dave @ ###-####. Structural final ok.
|
GCB-Ceiling Grid | 8/21/2012 | 8/22/2012 | 8/22/2012 | P | PASS |
Mike Jordan
|
|
|
Dave @ ###-#### PM inspection requested. Remainder of ceiling grid (cloud) ok.
|
GCB-Ceiling Grid | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | PART |
Dave Hannah
|
|
|
Dave @###-#### Grid cover inspection PM inspection for today requested. ok to cover all but the clouds crew still working on them
|
GCB-Ceiling Grid | 8/1/2012 | 8/2/2012 | 8/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
Dave @ ###-#### Annex Side (E) of Project east side ok
|
Plan assigned to (SRZ) | 7/3/2012 | 7/3/2012 | 7/12/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/3/2012 | | 7/12/2012 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
Plan Modification Review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2012 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 7/12/2012 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 7/3/2012 | | |
|
|
|
PLan modification
|
GCB-Energy | 6/7/2012 | 6/8/2012 | 6/8/2012 | A | PASS |
Mike Jordan
|
|
|
Dave @ ###-#### Call in advance 30 mins. Plan mod and engineering will be sent to Sam Z. Insulation under stages installed and is ok.
|
GCB-Framing | 5/25/2012 | 5/29/2012 | 5/29/2012 | A | PART |
Jim Sly
|
|
|
Dave @ ###-#### OK with framing except.....Talked to Dave about some walls removed in rooms 137, 138 and 139.........and door filled in (same area). Architect to contact Sam Z. at plan check To verify if re-submittal needed for approval. Engineer to provide paperwork for wire supports at interior soffit .....Front entry to the South. OK to start insulating.
|
GCB-Courtesy | 5/8/2012 | 5/9/2012 | 5/9/2012 | P | DONE |
Mike Jordan
|
|
|
Dave @ ###-#### Call 30 mins in advance - PM Inspection. Went over fire barrier wall isuues with contracotr and architect.
|
Plan assigned to (SRZ) | 2/9/2012 | 2/9/2012 | 3/13/2012 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Corrections needed.
|
Routing - Mechanical Review | 3/12/2012 | | 3/13/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 3/13/2012 | | 3/13/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2012 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 3/13/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/17/2012 | | 3/12/2012 | | PASS |
Sam Zahorka
|
|
|
2nd IBC Plan review. Issuance pending Mechanical review to pass.
|
Plan resubmittals received | | | 3/6/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/14/2012 | | 2/17/2012 | | FAIL |
Sam Zahorka
|
|
|
1st IBC Plan Review. Corrections needed.
|
1st review completed | | | 2/17/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 2/10/2012 | | 2/14/2012 | | FAIL |
Troy James
|
|
|
faxed comments to Tikker Eng
|
Application received | | | 2/2/2012 | | DONE |
|
|
|
|