GCB-Final | 3/27/2013 | 3/28/2013 | 3/28/2013 | A | FAIL |
Mike Jordan
|
|
|
Erin @ ###-#### Call for access. Provide indicator on main door, install ada compliant door hardware, install ada sign at restroom, mount fire extingusher with current annual inspection, resolve exterior emergency lighting issue, provide flush lever for toilet on turning side. Correction notice was issued.
|
GCB-Framing | 6/6/2012 | 6/7/2012 | 6/7/2012 | A | PASS |
Mike Jordan
|
|
|
###-#### Call in advance 30 mins. Interior steel stud framed wallls only ok. Pending electrical rough in inspection.
|
Routing - PLAN CHECK | 3/7/2012 | | 3/7/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with Resubs. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Issue and Courier | | | 3/7/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/6/2012 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 2/8/2012 | 2/8/2012 | 2/29/2012 | | DEFR |
Sam Zahorka
|
|
|
Defered plans to Tim W. on 2-24-12
|
Routing - PLAN CHECK | 2/24/2012 | | 2/29/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to review
|
Plan assigned to (TLW) | 2/29/2012 | | 2/29/2012 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 2/29/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 2/7/2012 | | DONE |
|
|
|
|