Permit Information
Permit NumberGCB12-00012
StatusFinaled
Name MOFFAT HOMES LLC
Site Address 210 E 40TH ST Unit: 105
Project NameBLD2012-00014
Customer Number 
ePlanReviewNo
Description
Moffat Homes Duplex Units 105 & 106- To construct a 1,836 sq.ft. one story Two family dwelling. Each unit has 918 sq.ft. Unit 105 has a 74 sq.ft. Covered front porch. Unit 106 has a 36 square foot Covered front porch. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INIVIDUAL UNITS. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/14/20143/14/20143/14/2014PPASS
DetailsMike Jordan
Bob ###-####. Structural final only ok. Tempered windows have been installed. No card on site to sign. Could not verify other trades final at this time.
GCB-Framing11/25/201311/25/201311/25/2013PPASS
DetailsDave Hannah
Stacey ###-####
GCB-Framing11/18/201311/18/201311/19/2013PNR
DetailsMike Jordan
Bob ###-####. Needs other trades first.
Plan resubmittals received  11/19/2013 DONE
new manual j for unit A and B
Routing - Mechanical Review11/19/2013 11/19/2013 PASS
DetailsTroy James
resubmitted manual j for unit A and B
CHANGE STATUS TO (ISS)  11/19/2013 DONE
GCB-Shearwall10/16/201310/16/201310/16/2013PPASS
DetailsMike Jordan
Bob ###-####. Exterior wall bracing only ok.
GCB-Shearwall10/10/201310/10/201310/10/2013PFAIL
DetailsMike Jordan
Bob ###-####. Provide approved set of plans and provide temp. addressing for units. Coreection notice posted.
GCB-Fndatn/slab ins/fld vent7/26/20137/29/20137/29/2013PPASS
DetailsMike Jordan
###-#### Heron
GCB-Footing7/26/20137/26/20137/26/2013PPASS
DetailsTom Arcoraci
Heron ###-####
GCB-Footing7/22/20137/22/20137/22/2013PNR
DetailsMike Jordan
Heron Phone #: ###-####
GCB-Footing7/19/20137/19/20137/19/2013PCANC
DetailsTom Arcoraci
GCB-Footing7/19/20137/19/20137/19/2013ACANC
DetailsTom Arcoraci
Heron ###-####
GCB-Footing7/12/20137/16/20137/16/2013ACANC
DetailsTom Arcoraci
Heron ###-####
GCB-Footing7/11/20137/11/20137/11/2013PCANC
DetailsTom Arcoraci
Heron ###-####
Issue and Courier  4/27/2012 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)3/30/20123/30/20124/26/2012 DONE
DetailsSam Zahorka
Pending Mechanical to pass.
Routing - Mechanical Review4/6/2012 4/26/2012 PASS
DetailsTroy James
Routing - PLAN CHECK4/26/2012 4/26/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/26/2012 DONE
DetailsSam Zahorka
Telephone call  4/6/2012 DONE
DetailsSam Zahorka
Spoke with Chad Moffit about proposed fire separation distance of 5 feet between this structure and the next duplex. I suggested he provide 10 feet fire separation distance rather than the proposed 5 feet. He agreed and I let him know I would call Garden City and inform them. Left message with Garden City. Waiting for a returned telephone call.
Routing - PLAN CHECK4/4/2012 4/6/2012 PEND
DetailsSam Zahorka
Pending Mechanical to pass
1st review completed  4/6/2012 DONE
DetailsSam Zahorka
Routing - Mechanical Review3/30/2012 4/3/2012 FAIL
DetailsTroy James
emailed corrections to AJ
Application received  2/10/2012 DONE