GCB-Final | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Mike Jordan
|
|
|
Bob ###-####. Structural final only ok. Tempered windows have been installed. No card on site to sign. Could not verify other trades final at this time.
|
GCB-Final | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | FAIL |
Jim Storey
|
|
|
Site Contact, Bob Moffat: ###-####. Please check records for energy inspection and advise Garden City.saftey glass back door less than 24 inches from door.
|
Plan resubmittals received | | | 11/19/2013 | | DONE |
|
|
|
new manual j unit A and B
|
Routing - Mechanical Review | 11/19/2013 | | 11/19/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j unit A and B
|
CHANGE STATUS TO (ISS) | | | 11/19/2013 | | DONE |
|
|
|
|
GCB-Framing | 10/22/2013 | 10/23/2013 | 10/23/2013 | P | PASS |
Tom Arcoraci
|
|
|
Bob ###-####
|
GCB-Framing | 10/18/2013 | 10/18/2013 | 10/18/2013 | P | PART |
Mike Jordan
|
|
|
Bob ###-####. ok to insulate. Still need 5/type x rock behind tubs one side and mech. rough in inspection failed on unit#2.
|
GCB-Framing | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | FAIL |
Mike Jordan
|
|
|
Bob ###-####. Provide mech. rough in inspection. Install 5/8 type x rock behind shower/tub for 1hr. firewall continuity. Firecaulk lowvoltage at 1hr. firewall. Correction notice posted.
|
GCB-Shearwall | 9/13/2013 | 9/16/2013 | 9/16/2013 | P | PASS |
Jim Sly
|
|
|
Bob ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/26/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Mike Jordan
|
|
|
###-#### Heron
|
GCB-Footing | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | NR |
Mike Jordan
|
|
|
Heron Phone #: ###-####. No forms in place. Surveyor on site. Noted that footing still need to be excavated an additional 15 to 20 inches.
|
GCB-Footing | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
GCB-Footing | 7/19/2013 | 7/19/2013 | 7/19/2013 | A | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/12/2013 | 7/16/2013 | 7/16/2013 | P | NR |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Footing | 7/12/2013 | 7/16/2013 | 7/16/2013 | A | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Footing | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|
Issue and Courier | | | 4/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | | 3/30/2012 | 4/26/2012 | | DONE |
Sam Zahorka
|
|
|
Pending Mechanical to pass.
|
Routing - Mechanical Review | 4/6/2012 | | 4/26/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/26/2012 | | 4/26/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 4/4/2012 | | 4/6/2012 | | PEND |
Sam Zahorka
|
|
|
Pending Mechanical to pass.
|
1st review completed | | | 4/6/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 3/30/2012 | | 4/3/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to AJ
|
Application received | | | 3/22/2012 | | DONE |
|
|
|
|