GCB-Final | 12/18/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Jim Sly
|
|
|
PM please..........C/C issued.
|
GCB-Energy | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Jim Sly
|
|
|
Kevin @ ###-####
|
GCB-Framing | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Jim Sly
|
|
|
|
GCB-Framing | 8/29/2012 | 8/30/2012 | 8/30/2012 | P | FAIL |
Mike Jordan
|
|
|
Kevin@ ###-####. West wall still lacking nailing for shear, renail at areas that have nails overdriven. Al other issues resolved. ok to insulate, do not cover exterior. Correction notice issued. Aslo tempered glazing not yet installed.
|
GCB-Framing | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | FAIL |
Mike Jordan
|
|
|
Kevin @ ###-####. Nail 2 ply girder as shown on truss engineering. Complete lateral bracing on A6,A7 and A8 trusses. More nailing is required on the portal frame. Nails at shear wall locations are overdriven, renail, areas that were stapled do not have correct spacing. Tempered glazing is required by doors in masterbedroom and dinning room. Correction notice was posted.
|
GCB-Fndatn/slab ins/fld vent | 6/5/2012 | 6/6/2012 | 6/6/2012 | A | PASS |
Jim Sly
|
|
|
Ryan @ ###-####
|
GCB-Footing | 6/4/2012 | 6/5/2012 | 6/5/2012 | P | PASS |
Jim Sly
|
|
|
Ryan @ ###-#### PM Inspection
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2012 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/7/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 5/3/2012 | 5/3/2012 | 5/4/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/4/2012 | | 5/4/2012 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - Mechanical Review | 5/3/2012 | | 5/4/2012 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/4/2012 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 5/4/2012 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 5/1/2012 | | DONE |
|
|
|
|