GCB-Final | 9/27/2012 | 9/28/2012 | 9/28/2012 | A | PASS |
Jim Sly
|
|
|
Kevin @ ###-#### Call for access Previous corrections completed. Unable to determin if all other agencies are finaled. Structural final only......OK.
|
GCB-Final | 9/26/2012 | 9/27/2012 | 9/27/2012 | P | FAIL |
Mike Jordan
|
|
|
Kevin @ ###-#### call for access. Provide required energy cert, provide blower door test results and post or the 3rd party airseal check report done at framing. Noted unprotected opening in garage dwelling seperation wall, does not comply with IRC sec. R302.5. Coorection notice was posted.
|
GCB-Energy | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Mike Jordan
|
|
|
Kevin @ ###-####
|
GCB-Framing | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Mike Jordan
|
|
|
Kevin @ ###-####
|
GCB-Framing | 7/16/2012 | 7/17/2012 | 7/17/2012 | A | PART |
Dave Hannah
|
|
|
Kevin @ ###-#### ok to insulate c/n on site
|
GCB-Framing | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | NR |
Mike Jordan
|
|
|
Kevin @ ###-####. Mechanical rough in inspection has failed.
|
GCB-Fndatn/slab ins/fld vent | 5/23/2012 | 5/24/2012 | 5/24/2012 | A | PASS |
Tom Arcoraci
|
|
|
SHANE @ ###-####
|
GCB-Footing | 5/22/2012 | 5/23/2012 | 5/23/2012 | P | PASS |
Jim Sly
|
|
|
Ryan @ ###-#### PM Inspection requested
|
Plan assigned to (SRZ) | | 5/11/2012 | 5/17/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/14/2012 | | 5/17/2012 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 5/17/2012 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2012 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/17/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Mechanical Review | 5/11/2012 | | 5/14/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to TML
|
Routing - Mechanical Review | 5/14/2012 | | 5/14/2012 | | PASS |
Troy James
|
|
|
|
Application received | | | 5/11/2012 | | DONE |
|
|
|
|