Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB12-00072
StatusFinaled
Name Reflection Homes
Site Address 10249 W CULTIS BAY
Project NameBLD2012-00072
Customer Number 
ePlanReviewNo
Description
**6-14-12 PLAN MODIFICATION TO INCLUDE: CHANGE THE SLAB ON GRADE FOUNDATION DESIGN TO A CRAWL SPACE DESIGN PER THE REVISED PLANS RECEIVED ON 6-12-2012. SRZ** To construct a 1,800 square foot, one story, three bedroom, two bathroom, Single family dwelling with a 20 square foot covered front porch, a 138 square foot covered rear patio, and a 557 square foot attached garage per the approved plans. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. FEMA (LOMR-F) noted on plans removing this property from the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final10/12/201210/15/201210/15/2012PPASS
DetailsMike Jordan
Trinity @ ###-####
am Inspection. Structural final only ok. No card on site to sign. Can not verify other trades finals at this time.
GCB-Final10/12/201210/12/201210/12/2012PCANC
DetailsTony Young
Trinity @ ###-####
am Inspection
GCB-Final10/11/201210/12/201210/12/2012ANR
DetailsTony Young
Trinity @ ###-####
am Inspection,, needs insulation under floor,, will happen on Monday,, I will reschedule for Monday pm
GCB-Final10/9/201210/11/201210/11/2012PFAIL
DetailsTony Young
Trinity @ ###-####
PM Inspection,, needs under floor insulation,, firewall completion
GCB-Energy8/15/20128/16/20128/16/2012APASS
DetailsMike Jordan
Kevin @ ###-####
AM Inspection Requested.
GCB-Framing8/15/20128/16/20128/16/2012APASS
DetailsMike Jordan
Kevin @ ###-####
AM Inspection Requested.
GCB-Framing8/10/20128/13/20128/13/2012PFAIL
DetailsMike Jordan
Kevin @ ###-####
AFternoon inspection requested.. Complete lateral bracing. Complete areas on exterior sheathing that were missed for shear. Fire block at fireplace. Ok to insulate only after mech. ri has been passed. Correction notice posted.
GCB-Fndatn/slab ins/fld vent6/15/20126/18/20126/18/2012APASS
DetailsJim Sly
Ryan @ ###-####
GCB-Footing6/14/20126/15/20126/15/2012APASS
DetailsJim Sly
Ryan @ ###-####
Plan assigned to (SRZ)6/12/20126/12/20126/14/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/12/2012 6/14/2012 PASS
DetailsSam Zahorka
Plan Modification passed.
Routing - Mechanical Review6/14/2012 6/14/2012 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/14/2012 DONE
DetailsSam Zahorka
CHANGE STATUS TO (ISS)  6/14/2012 DONE
DetailsBarbara Stitt
Plan mod issued
Plan resubmittals received  6/12/2012  
Received plan modification 6-12-12
GCB-Footing5/31/20126/1/20126/1/2012PCANC
DetailsDave Hannah
Ryan @ ###-####
Afternoon inspection requested
Plan assigned to (SRZ)5/22/20125/22/20125/29/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/23/2012 5/29/2012 PASS
DetailsSam Zahorka
Sam Zahorka
1st review completed  5/29/2012 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  5/29/2012 DONE
DetailsSam Zahorka
Issue and Courier  5/29/2012 DONE
DetailsBarbara Stitt
Routing - Mechanical Review5/22/2012 5/23/2012 PASS
DetailsTroy James
Application received  5/18/2012 DONE