Permit Information
Permit NumberGCB12-00078
StatusFinaled
Name BUILDERS UNLIMITED LLC
Site Address 10329 W CULTIS BAY
Project NameBLD2012-00078
Customer Number 
ePlanReviewNo
Description
***7-11-12 PLAN MODIFICATION TO INCLUDE: ADD A CONCRETE STEM WALL WITH FOOTING AT THE REAR COVERED PATIO SLAB AREA FOR A FUTURE SUNROOM PARTITION ADDITION AND REPLACE THREE MASTER BEDROOM SIDE WALL FXD WINDOWS WITH ONE 4040SLR WINDOW. SRZ*** To construct a 1,634 square foot, one story, three bedroom, two bathroom, Single family dwelling with a 172 square foot covered front porch, a 281 square foot covered rear patio, and a 467 square foot attached garage per the approved plans. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/30/201211/30/201211/30/2012PPASS
DetailsTony Young
John @ ###-####,,, structural final ok
GCB-Final11/29/201211/30/201211/30/2012AFAIL
DetailsTony Young
John @ ###-####,, not ready,, I re-scheduled for pm at contractors request
GCB-Final11/28/201211/29/201211/29/2012AFAIL
DetailsTom Arcoraci
John @ ###-#### needs tempered glazing in master bedroom windows at door or other approved material
GCB-Framing8/22/20128/23/20128/23/2012ACANC
DetailsMike Jordan
Kevin @ ###-####
GCB-Energy8/22/20128/23/20128/23/2012APASS
DetailsMike Jordan
Kevin @ ###-####
GCB-Framing8/20/20128/21/20128/21/2012APASS
DetailsJim Sly
Kevin @ ###-####
GCB-Stem wall7/17/20127/18/20127/18/2012APASS
DetailsTony Young
Westley @ ###-####
AM inspection requested,, reae porch wall ok
GCB-Fndatn/slab ins/fld vent7/13/20127/16/20127/16/2012APASS
DetailsTony Young
Westley @ ###-####
AM inspection requested,, patio foundation ok
Plan assigned to (SRZ) 7/11/20127/12/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/11/2012 7/12/2012 PASS
DetailsSam Zahorka
Plan Mod
PLANS/APPL TAKEN TO FRONT DESK  7/12/2012 DONE
DetailsSam Zahorka
Issue and Courier  7/12/2012 DONE
DetailsChristina Prado
Routing - Mechanical Review7/11/2012 7/11/2012 PASS
DetailsTroy James
GCB-Fndatn/slab ins/fld vent6/22/20126/25/20126/25/2012PPART
DetailsMike Jordan
Ryan @ ###-####
PM Inspection
GCB-Footing6/21/20126/22/20126/22/2012PPASS
DetailsDave Hannah
Ryan @ ###-####
PM Inspection
Plan assigned to (SRZ)6/11/20126/11/20126/18/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/12/2012 6/18/2012 PASS
DetailsSam Zahorka
Sam Zahorka
1st review completed  6/18/2012 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/18/2012 DONE
DetailsSam Zahorka
Issue and Courier  6/18/2012 DONE
DetailsBarbara Stitt
Routing - Mechanical Review6/11/2012 6/12/2012 PASS
DetailsTroy James
Application received  6/8/2012 DONE