Permit Information
Permit NumberGCB12-00091
StatusFinaled
Name Cory Matteucci
Site Address 9115 W CHINDEN BLVD
Project NameBLD2012-00091
Customer Number 
ePlanReviewNo
Description
Kilted Dragon Brewery- To remodel an existing 3,598 square foot tenant space in an existing building for use as an office, brewery, and assembly tasting room. Work to include: construct new interior non-bearing walls to separate the tasting room from the brew area, create an electrical room, and wash area; install a new walk-in cooler; install a new dual height (hi-lo) accessible drinking fountain; install a service sink; related interior finishes in compliance with chapter 8 of the 2009 IBC; plumbing work; electrical work; and all other work per the approved plans, attached plan review report, and all reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. No new lighting or mechanical work is proposed or allowed under this permit. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/15/201211/16/201211/16/2012APASS
DetailsTom Arcoraci
Corey @ ###-#### building final ok
GCB-Framing8/30/20128/30/20128/30/2012PPASS
DetailsMike Jordan
Cory Phone #: ###-####. Interior wood framed walls ok for cover.
GCB-Framing8/27/20128/27/20128/27/2012PPART
DetailsMike Jordan
Cory @ ###-####. Walk through only, rough ins not started . Will need to call for frmaing inspection again once rough ins have been completed.
Plan assigned to (SRZ)7/9/20127/25/20128/22/2012 DONE
DetailsSam Zahorka
on HOLD until GC ok's to Review for building. Early Plumbing permit being pulled. Plumbing drawings routed to Plumbing review for early review prior to Building Review.
8-13-12 1st review completed. Corrections needed.
Routing - PLAN CHECK8/20/2012 8/22/2012 PASS
DetailsSam Zahorka
Sam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  8/22/2012 DONE
DetailsSam Zahorka
Issue and Courier  8/22/2012 DONE
DetailsBarbara Stitt
Plan resubmittals received  8/20/2012  
Received 3 copies of plan review response comments, 3 copies of sheets A-1, A-2, C-1 and taken to Sam Zahorka
Routing - PLAN CHECK8/13/2012 8/13/2012 FAIL
DetailsSam Zahorka
1st review completed  8/13/2012 DONE
DetailsSam Zahorka
Plan resubmittals received  7/24/2012 DONE
DetailsSam Zahorka
Received 3 copies of sheet P1.1 and taken to Sam Zahorka on 7-24-12
Routing - Plumbing Review7/24/2012 7/24/2012 PASS
DetailsBill VanDegrift
Delivered resubmittals to Bill Vandegrift.
per resubmitted plans dated 7/24/12 and 2003 upc
Routing - Plumbing Review7/13/2012 7/16/2012 FAIL
DetailsBill VanDegrift
Spoke with Drake Mechanical. Requested corrections.
Telephone call  7/16/2012 DONE
DetailsSam Zahorka
Called G.C., Leon, and let him know the early Plumbing Review was completed. A telephone call was made by the Plumbing reviewer to Drake Mechanical requesting corrections. Waiting for Corrections.
Telephone call  7/12/2012 DONE
DetailsSam Zahorka
G.C. requested a hold on the Building Review until CDHD is completed. Early Plumbing Review OK'd by Bill Vandergrift.
Application received  7/6/2012 DONE
Routing - PLAN CHECK7/10/2012   PEND
DetailsSam Zahorka
on HOLD until GC ok's to Review for building. Early Plumbing permit being pulled. Plumbing drawings routed to Plumbing review for early review prior to Building Review.