Permit NumberGCB12-00111
StatusFinaled
Name Schneider Custom Homes,INC
Site Address 3820 N WILLOWBAR
Project NameBLD2012-00111
Customer Number 
ePlanReviewNo
Description
To construct a 2,347 square foot, Two story (1,743 square foot 1st story / 604 square foot 2nd story), with a 552 square foot attached garage, a 240 square foot covered rear patio, a 128 square foot covered rear 2nd story deck, and a 120 square foot covered concrete front porch. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain.**SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final2/28/20133/1/20133/1/2013PPASS
DetailsJim Sly
Dylan ###-####
GCB-Final2/27/20132/27/20132/27/2013PNR
DetailsTony Young
Dylan @ ###-####,, conf walk through
GCB-Energy12/20/201212/20/201212/21/2012PPASS
DetailsDave Hannah
Dylan @ ###-####
GCB-Framing12/17/201212/18/201212/18/2012PPASS
DetailsJim Sly
Dylan @ ###-####
PM Inspection
GCB-Shearwall11/29/201211/29/201211/29/2012PPASS
DetailsTony Young
Dylan @ ###-####,, exterior ok
GCB-Fndatn/slab ins/fld vent10/8/201210/8/201210/8/2012PPASS
DetailsJim Sly
Dylan @ ###-####
GCB-Footing10/1/201210/2/201210/2/2012PPASS
DetailsDave Hannah
Dylan @ ###-####
PM Inspection
Plan assigned to (SRZ)8/29/20128/29/20129/24/2012 DONE
DetailsSam Zahorka
1st review completed. Corrections needed.
Routing - PLAN CHECK9/21/2012 9/24/2012 PASS
DetailsSam Zahorka
Sam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/24/2012 DONE
DetailsSam Zahorka
Issue and Courier  9/24/2012 DONE
DetailsBarbara Stitt
Plan resubmittals received  9/21/2012  
Received 3 copies of sheet 1 (Cover page), sheet 2 (Foundatio/Framing), sheet 3 (Floor plan), sheet 4 (Elevation), sheet 5 (Typical sections page), sheet 6 (Wall bracing)
Routing - PLAN CHECK8/30/2012 9/4/2012 FAIL
DetailsSam Zahorka
Sam Zahorka
1st review completed  9/4/2012 DONE
DetailsSam Zahorka
Routing - Mechanical Review8/29/2012 8/30/2012 PASS
DetailsTroy James
Application received  8/29/2012 DONE