Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB12-00114
StatusFinaled
Name Plantation West Builders
Site Address 6529 W PLANTATION
Project NameBLD2012-00114
Customer Number 
ePlanReviewNo
Description
To construct a new 743 square foot storage room above an existing Single family attached garage per the approved plans. Work to include: remove the existing roof trusses above the garage and replace with engineered wood products for the floor joists and pre-engineered roof trusses; install new roof covering; construct a new stair to access the storage room floor; construct new exterior walls and finish; and install new garage doors and headers at new openings. All work per the approved plans, attached plan review report, and all other agencies final approvals. The Building Official has determined carbon monoxide poisoning, smoke and fire related hazards to be specific hazards associated with buildings and/or structures without smoke and carbon monoxide detection and alarm systems that do not meet current building codes. Carbon monoxide poisoning, smoke and fire related hazards are substantial hazards because the likelihood of death and or injury from said hazards increases in buildings and/or structures. The existing portions of buildings or structures with non-existent or inadequate smoke and carbon monoxide detection and alarm systems that do not meet current building codes must be retrofitted to meet current code requirements. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/8/20131/9/20131/9/2013APASS
DetailsTom Arcoraci
Ed @ ###-####
Call in advance struc final ok
GCB-Energy11/7/201211/7/201211/7/2012PPASS
DetailsTom Arcoraci
Ed @ ###-####
GCB-Framing10/30/201210/30/201210/30/2012PPASS
DetailsMike Jordan
###-####. ok to insulate.
Issue and Courier  9/25/2012 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)8/31/20128/31/20129/24/2012 DONE
DetailsSam Zahorka
1st review completed. Corrections needed.
Routing - PLAN CHECK9/21/2012 9/24/2012 PASS
DetailsSam Zahorka
Sam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/24/2012 DONE
DetailsSam Zahorka
Meeting  9/21/2012 DONE
DetailsSam Zahorka
Meeting at Garden City with Ed Altman the applicant. Went over corrections and his resubmittals.
Plan resubmittals received  9/21/2012  
Received 3 copies of stair section detail sheet, 3 copies of typical building section sheet, 3 copies of floor joist sheets and calcs, 3 copies of truss calcs, 3 copies of garage calcs
Telephone call  9/18/2012 DONE
DetailsSam Zahorka
Spoke with the applicant Ed Altman. Went over plan review corrections with him and let him know if he wants to meet to call Garden City and setup a meeting.
Routing - PLAN CHECK8/31/2012 9/6/2012 FAIL
DetailsSam Zahorka
Sam Zahorka
1st review completed  9/6/2012 DONE
DetailsSam Zahorka
Application received  8/30/2012 DONE