Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberGCB12-00119
StatusFinaled
Name Riverside Homes
Site Address 3631 N WILLOWBAR
Project NameBLD2012-00119
Customer Number 
ePlanReviewNo
Description
To construct a 2,168 square foot, Two story (945 square foot 1st story / 1,223 square foot 2nd story), with a 498 square foot attached garage, a 23 square foot covered side yard patio, and a 72 square foot covered concrete front porch. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. NOTE: ENGINEERING PROVIDED FOR SHEAR DESIGN. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final12/18/201212/19/201212/19/2012APASS
DetailsJim Storey
final bld only ok
GCB-Energy11/5/201211/6/201211/6/2012PPASS
DetailsDave Hannah
Chi @ ###-####
PM Inspection
GCB-Framing11/2/201211/5/201211/5/2012PPASS
DetailsJim Storey
Chi @ ###-####
GCB-Framing11/2/201211/2/201211/2/2012PFAIL
DetailsJim Storey
fireplace flue penatrating p/l wall < 3ft// mech aproval void/ no framing performed.
GCB-Energy11/1/201211/2/201211/2/2012PCANC
DetailsDave Hannah
Chi @ ###-####
PM Inspection///needs framing instead
CHANGE STATUS TO (ISS)  11/2/2012 DONE
Corrected Manual J was e-mailed back changed status back to Issued
GCB-Framing10/31/201211/1/201211/1/2012PNR
DetailsMike Jordan
Chi @ ###-####
PM Inspection. Still needs mech rough in inspection. Manual J has been resubmitted and is under review.
Routing - Mechanical Review10/30/2012 10/30/2012 PASS
DetailsTroy James
resubmitted manaul j
GCB-Shearwall10/22/201210/22/201210/22/2012PPASS
DetailsJim Sly
Chi @ ###-####
Please call in advance
GCB-Fndatn/slab ins/fld vent9/28/201210/1/201210/1/2012APASS
DetailsDave Hannah
Chris @ ###-####
GCB-Fndatn/slab ins/fld vent9/28/20129/28/20129/28/2012PCANC
DetailsDave Hannah
Chris @ ###-#### Canceled per Leon in email on 9-28-12 @ 12:40pm
GCB-Footing9/27/20129/27/20129/27/2012PPART
DetailsMike Jordan
Chris @ ###-####
Call to coordinate
Plan assigned to (SRZ)9/7/20129/7/20129/18/2012 DONE
DetailsSam Zahorka
Routing - PLAN CHECK9/10/2012 9/18/2012 PASS
DetailsSam Zahorka
Sam Zahorka
1st review completed  9/18/2012 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/18/2012 DONE
DetailsSam Zahorka
Issue and Courier  9/18/2012 DONE
DetailsBarbara Stitt
Routing - Mechanical Review9/7/2012 9/10/2012 PASS
DetailsTroy James
Application received  9/6/2012 DONE