GCB-Final | 5/16/2013 | 5/16/2013 | 5/16/2013 | P | PASS |
Tom Arcoraci
|
|
|
Gary ###-####(builder) Please call ahead for access. building final ok
|
Routing - Mechanical Review | 5/9/2013 | | 5/9/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
Plan resubmittals received | | | 5/9/2013 | | DONE |
|
|
|
new manual j
|
GCB-Energy | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | PASS |
Jim Sly
|
|
|
Nick ###-####
|
GCB-Framing | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PASS |
Tony Young
|
|
|
Nick ###-####,, garage/nanny quarters ok to insulate
|
GCB-Energy | 2/12/2013 | 2/12/2013 | 2/13/2013 | P | PASS |
Jim Sly
|
|
|
Nick ###-#### Need second part of Energy inspection All Framing passed,
|
GCB-Energy | 2/8/2013 | 2/8/2013 | 2/8/2013 | P | PART |
Jim Sly
|
|
|
Nick - ###-#### Blow in wall insulation on a house this size takes longer than usual. Partial inspection. OK to sheetrock 2nd floor only.
|
CHANGE STATUS TO (ISS) | | | 2/7/2013 | | DONE |
|
|
|
|
GCB-Framing | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PART |
Jim Sly
|
|
|
Nick @ ###-#### Gated Community Walked Thru with Nick and Framing contractor. I pointed out some truss bearing and lateral bracing issues. Need to fire block some areas. Mech has not passed yet and I asked Troy J and Bill V if it would be OK if they started to insulate Ext. walls. They said .it would be OK. Will call for Framing re-insp on Fri. OK to insulate.
|
Routing - Mechanical Review | 2/5/2013 | | 2/5/2013 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
GCB-Shearwall | 1/29/2013 | 1/29/2013 | 1/29/2013 | P | PASS |
Tony Young
|
|
|
Gary @ ###-#### Call for access - gated community Requested engineering information has been emailed to Christina and Barbara and should be on-site ,, exterior shear made ok
|
GCB-Shearwall | 1/28/2013 | 1/28/2013 | 1/29/2013 | P | FAIL |
Dave Hannah
|
|
|
Gary @ ###-#### Gated Community - Call for Access needs to use nails or get a stapel equl from engineer also need engineering for shear panel they cut a door in.
|
GCB-Fndatn/slab ins/fld vent | 11/14/2012 | 11/15/2012 | 11/15/2012 | P | PASS |
Mike Jordan
|
|
|
Jared @ ###-#### 3 PM Inspection
|
GCB-Fndatn/slab ins/fld vent | 11/13/2012 | 11/14/2012 | 11/14/2012 | P | PART |
Jim Sly
|
|
|
Jared @ ###-#### PM Inspection South and East walls OK.
|
GCB-Footing | 11/13/2012 | 11/13/2012 | 11/13/2012 | P | PASS |
Jim Sly
|
|
|
Jared @ ###-####
|
Issue and Courier | | | 11/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 10/30/2012 | 10/30/2012 | 11/7/2012 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Corrections needed.
|
Routing - PLAN CHECK | 11/7/2012 | | 11/7/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 11/1/2012 | | 11/6/2012 | | FAIL |
Sam Zahorka
|
|
|
Issuance pending beam addendum from engineer and fall prevention correction for 2nd story bedroom window location.
|
Telephone call | | | 11/6/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with engineer. He is emailing me updated beam information.
|
Telephone call | | | 11/6/2012 | | DONE |
Sam Zahorka
|
|
|
left message for designer and contractor/applicant. fall prevention for 2nd story window question.
|
Telephone call | | | 11/6/2012 | | DONE |
Sam Zahorka
|
|
|
left message for Garden City concerning Flood Plain.
|
1st review completed | | | 11/6/2012 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 11/2/2012 | | |
|
|
|
Received 3 copies of sheet A1.1 and taken to Sam Zahorka
|
Routing - Mechanical Review | 10/30/2012 | | 11/1/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Western Heating
|
Routing - Mechanical Review | 11/1/2012 | | 11/1/2012 | | PASS |
Troy James
|
|
|
|
Application received | | | 10/22/2012 | | DONE |
|
|
|
|