GCB-Final | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Jim Sly
|
|
|
Odie ###-####
|
Telephone call | | | 7/24/2013 | | DONE |
Sam Zahorka
|
|
|
spoke with Joel Bradshaw with Boise FIre and let him know about the addition of the oven to this permit. Let him know separate trade permits are required to be pulled and approved for the connection and hook up of the oven prior to final of this permit. He said he is ok with this.
|
Meeting | | | 7/24/2013 | | DONE |
Sam Zahorka
|
|
|
meeting with the mechanical reviewer, mechanical inspector, and the building official. I was directed to add the oven equipment to scope of this permit and required separate trade permits be pulled and finaled prior to final and occupancy of this permit.
|
Telephone call | | | 7/19/2013 | | DONE |
Sam Zahorka
|
|
|
Recieved a telephone call from Lori at Garden City. A mechanical oven has been added to the scope of this project with no approvals. A plan modification is required to include the oven. I called the architect and left a message. Waiting for the architect to call me back. SRZ
|
GCB-Final | 6/21/2013 | 6/21/2013 | 6/21/2013 | P | NR |
Tony Young
|
|
|
Tim ###-####,, NEED TRADES PER CONTRACTOR
|
GCB-Framing | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Mike Jordan
|
|
|
Tim Sparks ###-#### please call 1/2 hour advance. Interior steel stud framed walls for restroom.
|
GCB-Energy | 3/26/2013 | 3/26/2013 | 3/26/2013 | P | PART |
Tom Arcoraci
|
|
|
Tim ###-#### please give half hour notice if possible
|
GCB-Framing | 3/21/2013 | 3/21/2013 | 3/21/2013 | P | PASS |
Mike Jordan
|
|
|
Tim ###-#### please call half hour before arrival. Roof framing and diaphragm ok as well as all trusses.
|
GCB-Masonry | 3/7/2013 | 3/8/2013 | 3/8/2013 | P | PASS |
Jim Sly
|
|
|
Tim Sparks ###-#### please call in advance; grout pour at 2pm CMU grout pour !2 to 16' OK pending MTI special insp, tests and approvals.
|
GCB-Masonry | 3/5/2013 | 3/6/2013 | 3/6/2013 | A | PART |
Mike Jordan
|
|
|
Ken ###-#### also has MTI special inspection scheduled. 12ft. to 16ft. elevation on masonry walls. Grout being placed when arived on site. MTI on site also. ok.
|
GCB-Masonry | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | PART |
Jim Sly
|
|
|
Tim @ ###-#### Special Inspection scheduled with MTI Pouring grout at 1:30 p.m. Please call in advance CMU wall lift 4 to 8ft.....OK pending MTI insp. tests and approvals.
|
GCB-Masonry | 3/1/2013 | 3/1/2013 | 3/1/2013 | P | PART |
Jim Sly
|
|
|
Tim @ ###-#### Call in advance Special Inspection also scheduled CMU wall up to 4' lift.......OK pending MTI insp, tests and approvals.
|
GCB-Masonry | 2/27/2013 | 2/28/2013 | 2/28/2013 | A | PART |
Tony Young
|
|
|
Tim @ ###-#### Late morning inspection - call in advance,, 1st lift,, work in progress,, ok pending special inspection
|
GCB-Fndatn/slab ins/fld vent | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Jim Sly
|
|
|
Tim Sparks ###-#### OK pend MTI insp, tests and approvals..
|
GCB-Footing | 2/15/2013 | 2/15/2013 | 2/19/2013 | A | DONE |
Dave Hannah
|
|
|
TIM SPARKS ###-####
|
GCB-Footing | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Jim Sly
|
|
|
Tim Sparks Phone #: ###-#### please call prior to insepction Footing OK pending MTI special inspection, tests and approvals.
|
Plan assigned to (SRZ) | 12/11/2012 | 12/11/2012 | 1/14/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Waiting for Mechanical design for the spray booth.
|
CHANGE STATUS TO (ISS) | | | 1/14/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 12/19/2012 | | 12/19/2012 | | PASS |
Troy James
|
|
|
|
Telephone call | | | 12/11/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with and received an email from Gordan with NACFR. Explained the addition of a spray booth to this permits scope of work requires an engineered mechanical design for mechanical plan review approvals prior to issuance. I offered to call the architect and request the additional mechanical information.
|
Telephone call | | | 12/11/2012 | | DONE |
Sam Zahorka
|
|
|
Called the architect Tom Collins with Steed Construction and requested a fully engineered, stamped and signed, mechanical design for the addition of the spray booth. Let him know the exhaust for powder coating is regulated by the 2009 INC and IFC. He stated he would get the mechanical design and submitt to Garden City.
|
Telephone call | | | 12/10/2012 | | DONE |
Sam Zahorka
|
|
|
I spoke with Romeo and Gordon with the Fire department. Waiting for answers to Fire reviews questions. Additional building/mechanical reviews might be required based on the design professionals answers to fire review. Mechanical exhaust and Fire extinguishers and non-combustible wall construction for powder coating processes could be required. I called Garden City and let them know. Waiting for responses.
|
Routing - PLAN CHECK | 12/10/2012 | | 12/10/2012 | | PEND |
Sam Zahorka
|
|
|
Spoke with mechanical review. Waiting for answers from the design professional based on fire plan reviews questions. Mechanical design submittals stamped and signed plans possibly required for the design of a powder coating room or spray booths with a mechanical plan review required prior to issuance.
|
CHANGE STATUS TO (REV) | | | 12/10/2012 | | DONE |
Sam Zahorka
|
|
|
Due to Mechanical and Fire code issues. Pending answers from the architect.
|
Telephone call | | | 12/5/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with Leon w/ Garden City, Tom Collins the Architect, and Gordon with the Fire department about the confusion about the Fire sprinkler protection for this building. The architect meant to not provide fire sprinklers. There is no building code reason to require fire sprinklers. I requested Leon to re-route back to fire plan review to verify the removal of fire sprinklers would be ok per the Fire code. Issuance is pending Fire review approval
|
Plan assigned to (SRZ) | 10/30/2012 | 10/30/2012 | 11/30/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/30/2012 | | 11/30/2012 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 11/30/2012 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2012 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 11/30/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 11/14/2012 | | |
|
|
|
Received 3 copies of sheet C-1, ESC sheet, 3 copies of Storm narrative, 3 copies of Drainage Pond Design & Pond Drainage Calcs, 3 Copies of O & M, 3 copies of Geotechnical Report and taken to Sam Zahorka's desk
|
Application received | | | 10/26/2012 | | DONE |
|
|
|
|
GCB-Final | 7/25/2013 | 7/25/2013 | | P | |
Mike Jordan
|
|
|