Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB12-00153
StatusFinaled
Name French Homes Inc.
Site Address 448 E 51ST
Project NameBLD2012-00153
Customer Number 
ePlanReviewNo
Description
(Lot 5 Townhome) - To construct a new 1,369 square foot two story, (554 square foot 1st Story / 815 square foot 2nd Story), three bedroom, two and a half bathroom, single family dwelling townhouse with a 406 square foot attached two car garage, and a 40 square foot covered front porch, and a 48 square foot covered rear patio. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This lot is within a Floodplain area. The elevation certificate is attached to the approved plans. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/27/201312/2/201312/2/2013APASS
DetailsJim Sly
Dan ###-#### call for garage code access
Struct insp only....OK.
GCB-Energy4/29/20134/29/20134/30/2013PPASS
DetailsDave Hannah
Dan ###-####
GCB-Framing4/26/20134/26/20134/26/2013PPASS
DetailsJim Sly
Dan @ ###-####
Please inform GC Staff if any re-inspection fees should be applied to this project
GCB-Framing4/25/20134/25/20134/25/2013PNR
DetailsJim Sly
Dan @ ###-####
Complete corrections
GCB-Framing4/24/20134/24/20134/24/2013ADEFR
DetailsDave Hannah
Dan ###-####
GCB-Framing4/24/20134/24/20134/24/2013PFAIL
DetailsMike Jordan
Dan Phone #: ###-####. 2Hr. firewall to be continous to bottom side of roof deck, north side. Provide 2 layers of 5/8 type x rock at all soffits on 2 hr. wall. Complete all fireblocking at chases, ducts plumbing and furrwed out walls.Provide laydown parapet at south wall 1st. floor, repair laydown parapet were penetrated. Follow point load from beam upstairs. Correction notice posted. do not cover.
GCB-Fire Wall4/15/20134/15/20134/15/2013PPASS
DetailsMike Jordan
Dan @ ###-####
1st Layer of Drywall
Call in advance. BAse layer ok.
GCB-Fire Wall4/12/20134/15/20134/15/2013APART
DetailsMike Jordan
Dan @ ###-####. Ok to to install first layer of 5/8 type x rock on this unit only. Needs to remove foam seal from top plate electrical wire penetrations and fill with an approved intumesant caulking.
GCB-Shearwall4/11/20134/11/20134/11/2013PPASS
DetailsMike Jordan
Dan ###-####. Exterior wall bracing ok. This is for both units, 448 and 454. Contractor needs to start calling in both permits for inspections.
GCB-Fire Wall4/5/20134/8/20134/8/2013APASS
DetailsMike Jordan
Dan @ ###-####
Call in advance. Ok for 1st. layer of 5/8 type x.
GCB-Shearwall4/5/20134/8/20134/8/2013AFAIL
DetailsMike Jordan
Dan @ ###-####
Call in advance. Noted several areas were staples are overdriven or missing. areas marked on wall.
Plan assigned to (SRZ)4/3/20134/3/20134/3/2013 DONE
DetailsSam Zahorka
Sam Zahorka
Routing - PLAN CHECK4/3/2013 4/3/2013 PASS
DetailsSam Zahorka
Sam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/3/2013 DONE
DetailsSam Zahorka
CHANGE STATUS TO (ISS)  4/3/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  4/3/2013  
Plan modification-recieved 3 copies of Structural calcualtions for fire wall revisions, 3 sheets-beams supporting proposed bearing in fire wall all taken to Sam Zahorka's office
GCB-Fire Wall3/29/20134/1/20134/1/2013PDONE
DetailsMike Jordan
Dan @ ###-####
Call in advance. Conferance with builder. Needs to submit fixes for approval. Also went over continuity issues on 2 hr. firewall and penetrations in laydown parapet that need to be removed.
GCB-Framing3/29/20133/29/20133/29/2013PFAIL
DetailsMike Jordan
Dan @ ###-####. No approved plans on site. Per Sam still needs to submit corrections for approval.
Meeting  3/19/2013 DONE
DetailsSam Zahorka
Meeting with Dan French and his engineer/designer Shawn Reeder. Discussed how to fix the penetrations and continuity of the 2 hour townhouse separation walls. Offered solutions and requested engineering for the new column and footing locations. Also requested additional information about the continuity of the townhouse wall above the ceiling line to the roof deck. Shawn stated he would resubmit these correction items to plan review.
GCB-Footing2/15/20132/14/20132/19/2013PDONE
DetailsDave Hannah
Heron @ ###-####
PM Inspection
GCB-Footing2/15/20132/15/20132/15/2013PPASS
DetailsJim Sly
Huron Ready at 3:30 Phone #: ###-####
GCB-Footing2/14/20132/14/20132/14/2013PCANC
DetailsJim Sly
Heron @ ###-####
Contr.cancelled.
Plan assigned to (SRZ)11/20/201211/20/20121/18/2013 DONE
DetailsSam Zahorka
1st review completed.
Routing - PLAN CHECK1/14/2013 1/18/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/18/2013 DONE
DetailsSam Zahorka
Issue and Courier  1/18/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  1/11/2013 DONE
DetailsChristina Prado
Received three sets of plans marked A1.3, S1.0, S1.2, S5.0, E1.0 & three sheets with no label as well as three sets new REScheck & wall bracing calcs; routed to Sam for additional review
Meeting  12/7/2012 DONE
DetailsSam Zahorka
Met with the applicant. explained needed corrections items. Requested he hire a designer or engineer to assist him with correcting the drawings.
Plan resubmittals requested  12/7/2012 DONE
DetailsSam Zahorka
Spoke with the applicants engineer/designer. explained corrections and typed up an itemized report. emailed corrections to Garden City and the engineer.
Routing - PLAN CHECK12/7/2012 12/7/2012 FAIL
DetailsSam Zahorka
Telephone call  12/7/2012 DONE
DetailsSam Zahorka
Spoke to the applicant and his engineer/designer. Requested corrections.
Routing - PLAN CHECK11/21/2012 12/4/2012 FAIL
DetailsSam Zahorka
Incomplete submittals.
1st review completed  12/4/2012 DONE
DetailsSam Zahorka
Routing - Mechanical Review11/20/2012 11/21/2012 PASS
DetailsTroy James
Application received  11/16/2012 DONE