GCB-Final | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-####
|
GCB-Final | 6/4/2013 | 6/5/2013 | 6/5/2013 | P | FAIL |
Mike Jordan
|
|
|
Dan Phone #: ###-####. Provide blower door test results and post or the 3rd party airseal inspection report. Provide the approved energy cert and post. Remove roof vent from 4ft. laydown parapet and repair. Correction notice posted.
|
GCB-Energy | 4/29/2013 | 4/29/2013 | 4/30/2013 | P | PASS |
Dave Hannah
|
|
|
Dan ###-####
|
GCB-Framing | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Jim Sly
|
|
|
Dan @ ###-#### Please inform GC Staff if any re-inspection fees should be applied to this project
|
GCB-Framing | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | PART |
Jim Sly
|
|
|
Dan @ ###-#### OK to insulate......Need post in Gar.......point load from beam above. Need small pc. of rock at 2hr wall overbuild Garage.
|
GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | DEFR |
Dave Hannah
|
|
|
Dan ###-####
|
GCB-Fire Wall | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | DEFR |
Dave Hannah
|
|
|
Dan ###-####
|
GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | NR |
Mike Jordan
|
|
|
Dan Phone #: ###-####. no mech. ri inspection.
|
GCB-Fire Wall | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-####
|
Plan assigned to (SRZ) | 4/3/2013 | 4/3/2013 | 4/3/2013 | | DONE |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - PLAN CHECK | 4/3/2013 | | 4/3/2013 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2013 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 4/3/2013 | | |
|
|
|
Plan modification-recieved 3 copies of Structural calcualtions for fire wall revisions, 3 sheets-beams supporting proposed bearing in fire wall all taken to Sam Zahorka's office
|
GCB-Courtesy | 3/18/2013 | 3/19/2013 | 3/19/2013 | A | PART |
Tom Arcoraci
|
|
|
Dan French @ ###-#### 2 hour wall issues sent to plan review
|
Meeting | | | 3/19/2013 | | DONE |
Sam Zahorka
|
|
|
Meeting with Dan French and his engineer/designer Shawn Reeder. Discussed how to fix the penetrations and continuity of the 2 hour townhouse separation walls. Offered solutions and requested engineering for the new column and footing locations. Also requested additional information about the continuity of the townhouse wall above the ceiling line to the roof deck. Shawn stated he would resubmit these correction items to plan review.
|
GCB-Footing | 2/15/2013 | 2/14/2013 | 2/19/2013 | P | DONE |
Dave Hannah
|
|
|
Heron @ ###-#### PM Inspection
|
GCB-Footing | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Jim Sly
|
|
|
Huron-Ready at 3:30 Phone #: ###-####
|
GCB-Footing | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | CANC |
Jim Sly
|
|
|
Heron @ ###-#### Contr. Cancelled.
|
Plan assigned to (SRZ) | 11/20/2012 | 11/20/2012 | 1/18/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - PLAN CHECK | 1/14/2013 | | 1/18/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 1/18/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 1/11/2013 | | DONE |
Christina Prado
|
|
|
Received three sets of plans marked A1.3, S1.0, S1.2, S5.0, E1.0 & three sheets with no label as well as three sets new REScheck & wall bracing calcs; routed to Sam for additional review
|
Routing - PLAN CHECK | 12/7/2012 | | 12/7/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Plan resubmittals requested | | | 12/7/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with the applicants engineer/designer. explained corrections and typed up an itemized report. emailed corrections to Garden City and the engineer.
|
Meeting | | | 12/7/2012 | | DONE |
Sam Zahorka
|
|
|
Met with the applicant. explained needed corrections items. Requested he hire a designer or engineer to assist him with correcting the drawings.
|
Telephone call | | | 12/7/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke to the applicant and his engineer/designer. Requested corrections.
|
Routing - PLAN CHECK | 11/21/2012 | | 12/4/2012 | | FAIL |
Sam Zahorka
|
|
|
Incomplete submittals.
|
1st review completed | | | 12/4/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 11/20/2012 | | 11/21/2012 | | PASS |
Troy James
|
|
|
|
Application received | | | 11/16/2012 | | DONE |
|
|
|
|