GCB-Final | 9/6/2013 | 9/6/2013 | 9/6/2013 | P | NR |
Jim Sly
|
|
|
Mark ###-#### Call 20 min prior Need approved plan, final letter of approval from STRATA and Fire final.
|
GCB-Framing | 4/29/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Tom Arcoraci
|
|
|
Mark @ ###-#### PM Inspection
|
GCB-Stem wall | 3/13/2013 | 3/14/2013 | 3/14/2013 | P | PART |
Mike Jordan
|
|
|
Mark @ ###-#### PM Inspection. Perimeter stemwall ok. Also reviewed rfi from engineer of record deleting the transverse reinforcement in footing. Also reviewed special inspection report.
|
GCB-Footing | 3/11/2013 | 3/12/2013 | 3/12/2013 | A | PART |
Mike Jordan
|
|
|
Mark ###-#### requested by 10AM if possible. Perimeter footing for pump station. Will have special inspection. (strata) Contractor to provide RFI from engineer of record deleting the #5 transverese reinforcement at 16 inches o.c. in the footing as shown on approved plans.
|
Plan assigned to (SRZ) | 12/12/2012 | 12/12/2012 | 1/9/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Additional information needed.
|
Routing - PLAN CHECK | 1/9/2013 | | 1/9/2013 | | PASS |
Sam Zahorka
|
|
|
Booster Pump Station building only. Reservoir and its foundation require separate permits.
|
Telephone call | | | 1/9/2013 | | DONE |
Sam Zahorka
|
|
|
Telephone call with the applicant requesting to remove the Resevoir and its foundation from this permit. THis permit only includes the Booster pump station building. Separate permits are required for the Reservoir and it's foundation.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 1/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Mechanical Review | 12/24/2012 | | 12/26/2012 | | PASS |
Troy James
|
|
|
|
Routing - Plumbing Review | 12/26/2012 | | 12/26/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing - PLAN CHECK | 12/12/2012 | | 12/24/2012 | | FAIL |
Sam Zahorka
|
|
|
Additional information requested from the Engineer for the reservoir foundation. This information is needed prior to permit issuance.
|
1st review completed | | | 12/24/2012 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 12/11/2012 | | DONE |
|
|
|
|