GCB-Final | 6/25/2013 | 6/25/2013 | 6/25/2013 | A | PASS |
Dave Hannah
|
|
|
Lee Healy ###-####
|
GCB-Final | 6/21/2013 | 6/24/2013 | 6/24/2013 | P | FAIL |
Jim Sly
|
|
|
Lee ###-#### please call in advance for access Need min. 36" landings. Need complying handrails. Need egress window or door with code complying landing, stairs and handrail. (East Bedroom).
|
GCB-Final | 6/20/2013 | 6/21/2013 | 6/21/2013 | P | NR |
Tony Young
|
|
|
Lee ###-#### please call in advance for access,, NEED TO MAKE EXTRA DOORS COMPLY WITH LANDING/STEPS,, OR MAKE INOPERABLE
|
GCB-Final | 6/12/2013 | 6/12/2013 | 6/12/2013 | A | DONE |
Dave Hannah
|
|
|
Lee ###-####
|
GCB-Final | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | FAIL |
Mike Jordan
|
|
|
Lee ###-####. Provide code compliant stairway. Geet all other finals.
|
GCB-Energy | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Tony Young
|
|
|
Lee Phone #: ###-####
|
GCB-Energy | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | DEFR |
Dave Hannah
|
|
|
Lee ###-####
|
GCB-Framing | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
Penelope ###-#### pending elec rough in
|
Plan assigned to (SRZ) | 4/4/2013 | 4/4/2013 | 4/5/2013 | | DONE |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - PLAN CHECK | 4/4/2013 | | 4/5/2013 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 4/5/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 4/4/2013 | | |
|
|
|
Received 3 copies of cover transmittal, 3 copies of half bath laundry plan, 3 copies of half bath laundry ele plan, original application and plans--all taken to Sam Zahorka's desk
|
GCB-Courtesy | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | DONE |
Jim Sly
|
|
|
Penelope @ ###-#### Call in advance
|
Plan assigned to (SRZ) | 2/15/2013 | 2/15/2013 | 2/21/2013 | | DONE |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - PLAN CHECK | 2/15/2013 | | 2/21/2013 | | PASS |
Sam Zahorka
|
|
|
Per redline comments and plan review report.
|
Telephone call | | | 2/21/2013 | | DONE |
Sam Zahorka
|
|
|
Called the engineer/designer Shawn Reeder. Let him know a 3068 main egress door is required along with a code compliant exterior landing and stairway.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2013 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 2/21/2013 | | DONE |
Sam Zahorka
|
|
|
Left message for Lee Healy. Trying to let him know about the red-lines on the approved plans concerning the Means of Egress per IRC section 311. Called the Engineer/Designer.
|
Issue and Courier | | | 2/21/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 2/15/2013 | 2/15/2013 | | DONE |
Barbara Stitt
|
|
|
|