Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB13-00012
StatusFinaled
Name LEE HEALY
Site Address 520 E 43RD ST Unit: 13
Project NameBLD2013-00012
Customer Number 
ePlanReviewNo
Description
***4-5-13 Plan Modification changing the layout of one of the bathrooms per approved plans.*** To construct an interior remodel to an existing manufactured home located in space #13 of this mobile home park. This remodel will convert this manufactured home from a multi-unit to a single family residence. Work to include: remove an interior wall at the mid point of the structure; delete two bedroom areas at the midpoint of the structure; install smoke and carbon monoxide alarms per plan locations; and electrical and mechanical work. All work per the approved plans, engineering, and the structural inspectors final approval. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final6/25/20136/25/20136/25/2013APASS
DetailsDave Hannah
Lee Healy ###-####
GCB-Final6/21/20136/24/20136/24/2013PFAIL
DetailsJim Sly
Lee ###-#### please call in advance for access
Need min. 36" landings. Need complying handrails. Need egress window or door with code complying landing, stairs and handrail. (East Bedroom).
GCB-Final6/20/20136/21/20136/21/2013PNR
DetailsTony Young
Lee ###-#### please call in advance for access,, NEED TO MAKE EXTRA DOORS COMPLY WITH LANDING/STEPS,, OR MAKE INOPERABLE
GCB-Final6/12/20136/12/20136/12/2013ADONE
DetailsDave Hannah
Lee ###-####
GCB-Final6/11/20136/12/20136/12/2013AFAIL
DetailsMike Jordan
Lee ###-####. Provide code compliant stairway. Geet all other finals.
GCB-Energy4/24/20134/24/20134/24/2013PPASS
DetailsTony Young
Lee Phone #: ###-####
GCB-Energy4/24/20134/24/20134/24/2013ADEFR
DetailsDave Hannah
Lee ###-####
GCB-Framing4/10/20134/11/20134/11/2013APASS
DetailsTom Arcoraci
Penelope ###-#### pending elec rough in
Plan assigned to (SRZ)4/4/20134/4/20134/5/2013 DONE
DetailsSam Zahorka
Sam Zahorka
Routing - PLAN CHECK4/4/2013 4/5/2013 PASS
DetailsSam Zahorka
Sam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/5/2013 DONE
DetailsSam Zahorka
Issue and Courier  4/5/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  4/4/2013  
Received 3 copies of cover transmittal, 3 copies of half bath laundry plan, 3 copies of half bath laundry ele plan, original application and plans--all taken to Sam Zahorka's desk
GCB-Courtesy4/1/20134/2/20134/2/2013ADONE
DetailsJim Sly
Penelope @ ###-####
Call in advance
Plan assigned to (SRZ)2/15/20132/15/20132/21/2013 DONE
DetailsSam Zahorka
Sam Zahorka
Routing - PLAN CHECK2/15/2013 2/21/2013 PASS
DetailsSam Zahorka
Per redline comments and plan review report.
Telephone call  2/21/2013 DONE
DetailsSam Zahorka
Called the engineer/designer Shawn Reeder. Let him know a 3068 main egress door is required along with a code compliant exterior landing and stairway.
PLANS/APPL TAKEN TO FRONT DESK  2/21/2013 DONE
DetailsSam Zahorka
Telephone call  2/21/2013 DONE
DetailsSam Zahorka
Left message for Lee Healy. Trying to let him know about the red-lines on the approved plans concerning the Means of Egress per IRC section 311. Called the Engineer/Designer.
Issue and Courier  2/21/2013 DONE
DetailsBarbara Stitt
Application received 2/15/20132/15/2013 DONE
DetailsBarbara Stitt