Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB13-00017
StatusFinaled
Name Wood River Builders
Site Address 6087 WILLOWDALE
Project NameBLD2013-00017
Customer Number 
ePlanReviewNo
Description
To construct a 1,812 square foot, one story, three bedroom, two bathroom, Single family dwelling with a 41 square foot covered front porch, a 63 square foot covered rear patio, and a 673 square foot attached garage per the approved plans. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final5/27/20135/23/20135/28/2013PDONE
DetailsDave Hannah
###-#### Airblower test posted on furnace
GCB-Final5/23/20135/24/20135/24/2013APASS
DetailsJim Sly
Airblower test posted on furnace Phone #: ###-####
Unable to determine if all other permits have been finaled. Structural final Only.....OK.
GCB-Final5/21/20135/22/20135/22/2013PFAIL
DetailsMike Jordan
###-####. Post blower door test results or the 3rd party airseal inspection reoprt. Complete the required enrgy cert.
GCB-Energy4/17/20134/17/20134/17/2013PPASS
DetailsJim Sly
Bob ###-####
GCB-Framing4/16/20134/16/20134/16/2013PPART
DetailsTony Young
Bob ###-####,, need to strap top plates not lapped,, need to overlap truss bracing,, need solid support under overbuild rafter tails,, ok to insulate,,NOTE,, VERIFY TRADES ARE ALL SIGNED OFF PRIOR TO COVER APPROVAL
GCB-Shearwall4/4/20134/8/20134/8/2013APASS
DetailsJim Sly
Bob ###-####
GCB-Fndatn/slab ins/fld vent3/27/20133/27/20133/28/2013PDONE
DetailsMike Jordan
###-####
GCB-Fndatn/slab ins/fld vent3/27/20133/27/20133/27/2013PPASS
DetailsTom Arcoraci
GCB-Footing3/26/20133/26/20133/26/2013PCANC
DetailsTom Arcoraci
Joe ###-####
Issue and Courier  3/14/2013 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)3/8/20133/8/20133/13/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK3/12/2013 3/13/2013 PASS
DetailsSam Zahorka
Sam Zahorka
1st review completed  3/13/2013 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/13/2013 DONE
DetailsSam Zahorka
Routing - Mechanical Review3/8/2013 3/12/2013 PASS
DetailsTroy James
Application received  3/6/2013 DONE
DetailsBarbara Stitt