GCB-Final | 1/23/2014 | 1/24/2014 | 1/24/2014 | A | PASS |
Jim Sly
|
|
|
jOE ###-#### CALL FIRST
|
GCB-Final | 1/8/2014 | 1/8/2014 | 1/8/2014 | P | FAIL |
Mike Jordan
|
|
|
Joe ###-#### Call when on your way. Complete handrail attachment in dweling unit. A handrail is also required at stairs to bonus room above garage. Correction notice posted.
|
GCB-Framing | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Jim Storey
|
|
|
c/n made ok
|
GCB-Energy | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Jim Storey
|
|
|
|
GCB-Framing | 9/11/2013 | 9/11/2013 | 9/11/2013 | A | PASS |
Jim Storey
|
|
|
c/n made ok
|
GCB-Energy | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | FAIL |
Mike Jordan
|
|
|
Josh ###-####. Firecaulk wires in garage at 1hr. wall, Provide fire blocking upstairs at plumbing and north side pop out as previously noted. Correction notice posted.
|
GCB-Framing | 8/27/2013 | 8/28/2013 | 8/28/2013 | A | FAIL |
Mike Jordan
|
|
|
Josh ###-#### call first. Complete lateral bracing on D2 trusses. Firecaulk all membrane penetrations (electrical wires in garage). Roll block floor joist at bearing walls by stairs, north and south sides. Firebloblock concealed spaces upstairs , North side were insulated duct passes and south side at roof drains, this area will also be blown full of insulation. ok to insulate.
|
GCB-Shearwall | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
Josh ###-#### call first
|
GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PART |
Jim Sly
|
|
|
Josh ###-#### All nailing for shear and 2hr wall OK at all concealed spaces @ boxed pop outs.....Rear wall and Gar. fronts. Note: ..Need retro fit HD's At Gar. front portal.
|
Plan assigned to (SRZ) | 6/20/2013 | 6/20/2013 | 6/28/2013 | | DONE |
Sam Zahorka
|
|
|
Pending Mechanical Review to PASS.
|
Routing - PLAN CHECK | 6/24/2013 | | 6/28/2013 | | PASS |
Sam Zahorka
|
|
|
Mechanical Review to PASS.
|
Routing - Mechanical Review | 6/28/2013 | | 6/28/2013 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 6/28/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Mechanical Review | 6/20/2013 | | 6/24/2013 | | FAIL |
Troy James
|
|
|
emailed correction to building energy
|
Plan resubmittals received | | | 6/20/2013 | | |
|
|
|
Plan modification-Received 3 copies of sheets A-1, A-2, A-3, A-4, S-0, S-1, S-2, S-3, E-1, E-2, AD-1, FS-1, 3 copies of Latteral Calcs, 3 copies of Manual J's
|
GCB-Fndatn/slab ins/fld vent | 5/6/2013 | 5/6/2013 | 5/7/2013 | P | PASS |
Jim Sly
|
|
|
Mana ###-####
|
GCB-Fndatn/slab ins/fld vent | 5/3/2013 | 5/3/2013 | 5/6/2013 | P | CANC |
Jim Sly
|
|
|
Mana ###-####
|
GCB-Footing | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PART |
Mike Jordan
|
|
|
MANA ###-#### Between 9-10. Needs to replace some form boards to meet min. footing depths.
|
GCB-Footing | 4/29/2013 | 4/29/2013 | 4/30/2013 | P | NR |
Tony Young
|
|
|
MANA ###-####
|
Plan assigned to (SRZ) | | 3/19/2013 | 4/19/2013 | | DONE |
Sam Zahorka
|
|
|
1st Review Completed.
|
Routing - PLAN CHECK | 4/19/2013 | | 4/19/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 4/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 4/16/2013 | | |
|
|
|
Recieved 3 copies of response letter from John Roth dated 4-16-13, 3 copies of lateral calcs, and 3 copies of sheets A-1, A-2, A-3, A-4, S-0, S-1, S-2S-3, E-1, E-2, FS-1 and taken to Sam Sahorka's desk
|
Routing - Mechanical Review | 3/28/2013 | | 3/28/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 3/21/2013 | | 3/27/2013 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 3/27/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 3/19/2013 | | 3/21/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to building energy
|
Application received | | | 3/15/2013 | | DONE |
|
|
|
|