Permit NumberGCB13-00026
StatusFinaled
Name Roth Homes
Site Address 10185 W CARLTON BAY
Project NameBLD2013-00026
Customer Number 
ePlanReviewNo
Description
Lot 17 Townhome - **6/24/13 PLAN MODIFICATIONS APPROVED PER PLANS RECIEVED ON 6/19/2013. SRZ** To construct a new 1,852 square foot (911 square foot 1st story / 941 square foot 2nd story), two story, three bedroom, two and a half bathroom, single family dwelling townhouse with a 480 square foot dettached two car garage, and a 34 square foot covered front stoop. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This lot is located within a Floodplain area. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final6/22/20156/23/20156/23/2015APASS
DetailsDave Hannah
Manny ###-####
GCB-Framing4/2/20154/3/20154/3/2015APASS
DetailsDave Hannah
Mark ###-#### - requested 30min call ahead insulation also ok
GCB-Framing4/1/20154/2/20154/2/2015AFAIL
DetailsJim Sly
Mark ###-#### - requested 30min call ahead
c/n complete rock ....4' each side 2hr wall.
GCB-Framing3/26/20153/27/20153/27/2015APART
DetailsDave Hannah
Mark ###-#### ok to insulate party walls
GCB-Shearwall7/19/20137/19/20137/19/2013PPASS
DetailsTom Arcoraci
Josh ###-#### call first
GCB-Framing6/27/20136/28/20136/28/2013ACANC
DetailsJim Sly
###-#### Josh
All nailing for shear and 2hr. wall OK @ all concealed spaces at boxed pop outs.......Rear wall and Gar. fronts. Note:......Need retro fit HD's at Gar. front portal.
Plan assigned to (SRZ)6/20/20136/20/20136/28/2013 DONE
DetailsSam Zahorka
Pending Mechanical Review to PASS.
Routing - PLAN CHECK6/24/2013 6/28/2013 PASS
DetailsSam Zahorka
Mechanical Review to PASS.
Routing - Mechanical Review6/28/2013 6/28/2013 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/28/2013 DONE
DetailsSam Zahorka
Issue and Courier  6/28/2013 DONE
DetailsBarbara Stitt
Routing - Mechanical Review6/20/2013 6/24/2013 FAIL
DetailsTroy James
emailed correction to building energy
Plan resubmittals received  6/20/2013  
Plan modification-Received 3 copies of sheets A-1, A-2, A-3, A-4, S-0, S-1, S-2, S-3, E-1, E-2, AD-1, FS-1, 3 copies of Latteral Calcs, 3 copies of Manual J's
GCB-Fndatn/slab ins/fld vent5/6/20135/6/20135/7/2013PPASS
DetailsJim Sly
Mana ###-####
GCB-Fndatn/slab ins/fld vent5/3/20135/3/20135/6/2013PCANC
DetailsJim Sly
Mana ###-####
GCB-Footing4/30/20135/1/20135/1/2013APART
DetailsMike Jordan
MANA ###-####
Between 9-10. Needs to replace some form boards to meet min. footing depths.
GCB-Footing4/29/20134/29/20134/30/2013PCANC
DetailsTony Young
MANA ###-####
Plan assigned to (SRZ) 3/19/20134/19/2013 DONE
DetailsSam Zahorka
1st Review Completed.
Routing - PLAN CHECK4/19/2013 4/19/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/19/2013 DONE
DetailsSam Zahorka
Issue and Courier  4/19/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  4/16/2013  
Recieved 3 copies of response letter from John Roth dated 4-16-13, 3 copies of lateral calcs, and 3 copies of sheets A-1, A-2, A-3, A-4, S-0, S-1, S-2S-3, E-1, E-2, FS-1 and taken to Sam Sahorka's desk
Routing - Mechanical Review3/28/2013 3/28/2013 PASS
DetailsTroy James
Routing - PLAN CHECK3/21/2013 3/27/2013 FAIL
DetailsSam Zahorka
1st review completed  3/27/2013 DONE
DetailsSam Zahorka
Routing - Mechanical Review3/19/2013 3/21/2013 FAIL
DetailsTroy James
emailed corrections to building energy
Application received  3/15/2013 DONE