Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberGCB13-00038
StatusFinaled
Name C. Laraway Designs P.A.
Site Address 10254 W CARLTON BAY
Project NameBLD2013-00038
Customer Number 
ePlanReviewNo
Description
Bowman Funeral Directors - **3/28/14 PLAN MODIFICATION TO INCLUDE: INSTALLATION OF A STANDING SEAM METAL ROOF COVERING RATHER THAN ARCHITECTURAL COMPOSITION ASPHALT SHINGLES. - 2/6/14 PLAN MODIFICATION TO INCLUDE: MODIFY THE BUILDING PARAPETS PER THE APPROVED PLANS. SRZ** To construct a new 6,585 square foot, one story, wood framed, funeral chapel. The new building will contain a: Entrance Alcove, Chapel, Viewing room, Offices, Arrangement room, Coffee Bar Kitchen, Accessible Restrooms, Storage rooms, Walk-in Cooler, Prep. room, Creamatory, and attached garage. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Note: This building is not fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/21/20147/22/20147/22/2014PPASS
DetailsTony Young
ok for c of o
GCB-Final7/21/20147/22/20147/22/2014APEND
DetailsTony Young
GCB-Final7/16/20147/18/20147/18/2014AFAIL
DetailsMike Jordan
Mark ###-####. Needs to provide the correct door hardware for required exits.
GCB-Energy4/22/20144/23/20144/23/2014APASS
DetailsJim Sly
Mark ###-#### re-inspect insulation
GCB-Framing4/23/20144/23/20144/23/2014PPASS
DetailsJim Sly
Corrections completed. OK to cover.
GCB-Energy4/14/20144/15/20144/15/2014PPART
DetailsJim Sly
Mark ###-#### Note, this was originally scheduled for morning, request changed to afternoon
C/N Roof insulation cannot have exposed Kraft Face. Insulation adjacent to attic space to be encapsulated on all 6 sides. Verify that a 60 # test was done on Gas Line. I Ok'd to rock up to 8' on all walls..........After gas test verified.
GCB-Energy4/11/20144/15/20144/15/2014AFAIL
DetailsJim Sly
Mark ###-#### insulation
No approved plans on site....C/N posted.
GCB-Framing4/1/20144/2/20144/2/2014PPASS
DetailsDave Hannah
Mark ###-#### framing re-inspection
Plan assigned to (SRZ)3/26/20143/26/20143/28/2014 DONE
DetailsSam Zahorka
Plan Modification
Routing - PLAN CHECK3/26/2014 3/28/2014 PASS
DetailsSam Zahorka
CHANGE STATUS TO (ISS)  3/28/2014 DONE
DetailsSam Zahorka
CHANGE STATUS TO (REV)  3/26/2014 DONE
DetailsBarbara Stitt
Plan resubmittals received  3/26/2014  
Plan modification-sheets A3.06, A5.1, A5.2, A6.2-3 sets
GCB-Framing3/19/20143/20/20143/24/2014PPART
DetailsDave Hannah
Mark ###-#### fire blocking and seal package shear ok to cover ext trusses ok framing ok note one hr fire wall around cremation room is a ? on how to do.
GCB-Courtesy2/18/20142/18/20142/19/2014PPASS
DetailsJim Sly
Mark ###-#### Rebar on trash enclosure
CHANGE STATUS TO (ISS)  2/7/2014 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)2/5/20142/5/20142/6/2014 DONE
DetailsSam Zahorka
Plan modification
Routing - PLAN CHECK2/5/2014 2/6/2014 PASS
DetailsSam Zahorka
Sam Zahorka
Routing - Mechanical Review2/6/2014 2/6/2014 PASS
DetailsTroy James
Plan Mod
PLANS/APPL TAKEN TO FRONT DESK  2/6/2014 DONE
DetailsSam Zahorka
CHANGE STATUS TO (REV)  2/5/2014  
Revised plans submited 2-5-14
Plan resubmittals received  2/5/2014  
Received cover transmittal, 3 copies of sheets A3.6, A5.1, A5.2, A6.2 and taken to Sam Zahorka's desk
GCB-Footing11/7/201311/7/201311/7/2013PPEND
DetailsTony Young
Mike ###-####,, special inspection report,, interior footings
GCB-Footing10/30/201310/30/201310/30/2013PPEND
DetailsTony Young
Mark ###-####,, ok pending special inspection
GCB-Stem wall10/28/201310/29/201310/29/2013PPASS
DetailsDave Hannah
Mark ###-####
GCB-Footing10/22/201310/23/201310/23/2013APART
DetailsMike Jordan
Mark ###-####. Provide the additional #4 rebar mat at nw wing of bldg. Special inspector to verify.
Issue and Courier  7/30/2013 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)5/8/20135/8/20137/29/2013 DONE
DetailsSam Zahorka
1st Review completed. Corrections needed.
Plan resubmittals received  7/29/2013  
Received 3 copies of plan review response, 1 copy of cross access easement agreement, 1 copy of statment of special inspections, 1 copy of structural calculations, 1 copy of structural insulated panels, 3 copies of sheets 0.1, A0.1, A1.0, A2.1, A3.5, A3.4, A6.2, A7.1, A7.2, A8.1, L1.0, C1.0, C2.0, C3.0, C3.1, C4.0, C5.0, M2.1, M1.0, E1.0, E2.0 and taken to Sam Zahorka's desk
Routing - PLAN CHECK7/29/2013 7/29/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/29/2013 DONE
DetailsSam Zahorka
Meeting  7/22/2013 DONE
DetailsSam Zahorka
The architect visited the City of Boise PDS and wanted to provide his signatures on his stamped plans. I brought his plans to the front desk and he signed them.
Telephone call  7/17/2013 DONE
DetailsSam Zahorka
Spoke with Cheryl Bowman about needed corrections and Special Inspection information in order to complete the plan review for this project. I requested her to set up a meeting at Garden City with her architect to communicate needed items to expedite permitting. She said she would schedule the meeting with Garden City.
Telephone call  7/15/2013 DONE
DetailsSam Zahorka
Called the owner and discussed the building permit status. Emailed the 1st Building Plan Review report and dates of telephone and email correspondance between myself and the architect.
Telephone call  6/10/2013 DONE
DetailsSam Zahorka
Called the architect and requested structural for the proposed human creamation furnace. The information for the furnace was not provided prior to the 1st review being completed. engineering and calculations are needed to verify the proposed slab thickness is adequate to carry the furnaces weight of 18,126 lbs. Also sent an email requesting addtional engineering.
1st review completed  5/24/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/14/2013 5/24/2013 FAIL
DetailsSam Zahorka
Sam Zahorka
Routing - Plumbing Review5/13/2013 5/14/2013 PASS
DetailsDaryl Spivey
Per plan and 2009 ISPC.
Routing - Mechanical Review5/8/2013 5/13/2013 PASS
DetailsTroy James
CHANGE STATUS TO (REV)  4/16/2013 PASS
DetailsSam Zahorka
Application received  4/1/2013 DONE