GCB-Final | 9/25/2013 | 9/26/2013 | 9/26/2013 | P | PASS |
Mike Jordan
|
|
|
Braydon ###-#### Call first. Structural final only ok.
|
GCB-Shearwall | 7/30/2013 | 7/31/2013 | 7/31/2013 | A | PASS |
Jim Storey
|
|
|
Braydon ###-####
|
GCB-Energy | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PASS |
Mike Jordan
|
|
|
Braydon ###-####
|
GCB-Framing | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Mike Jordan
|
|
|
Braydon ###-#### After 2:30 Call first. Wall bracing ok. Framing ok. ok to insulate.
|
GCB-Framing | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | FAIL |
Mike Jordan
|
|
|
Provide truss engineering. Remove DWV from laydown parapet and repair hole, correct wall bracing. Correction notice posted.
|
GCB-Framing | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | NR |
Jim Sly
|
|
|
Braydon ###-####
|
GCB-Shearwall | 7/3/2013 | 7/3/2013 | 7/3/2013 | P | NR |
Dave Hannah
|
|
|
Braydon ###-#### Call for entry instructions
|
GCB-Fire Wall | 6/21/2013 | 6/21/2013 | 6/21/2013 | P | PASS |
Mike Jordan
|
|
|
Mike ###-#### Courtesy inspection of firewall
|
GCB-Fire Wall | 6/10/2013 | 6/11/2013 | 6/11/2013 | P | PASS |
Mike Jordan
|
|
|
###-####. 2hr. fire wall, 5/8 type x rock, base and face layers on side only, insulation and framing on 2hr.walls ok.
|
GCB-Fndatn/slab ins/fld vent | 5/17/2013 | 5/17/2013 | 5/17/2013 | A | PASS |
Dave Hannah
|
|
|
Adam ###-####
|
Plan assigned to (SRZ) | 4/18/2013 | 4/18/2013 | 5/6/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - PLAN CHECK | 5/6/2013 | | 5/6/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 5/6/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 4/19/2013 | | 4/29/2013 | | FAIL |
Sam Zahorka
|
|
|
Corrections needed.
|
1st review completed | | | 4/29/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 4/18/2013 | | 4/19/2013 | | PASS |
Troy James
|
|
|
|
Application received | | | 4/12/2013 | | DONE |
|
|
|
|