GCB-Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####. structural final ok. Aslo noted that footing and framing inspections were done and recorded under 3682 adam st. (GCB13-00070)
|
GCB-Final | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | NR |
Mike Jordan
|
|
|
jEREMY ###-####
|
GCB-Final | 1/13/2014 | 1/14/2014 | 1/14/2014 | P | FAIL |
Mike Jordan
|
|
|
Jeremy ###-#### No footings inspection recorded--please make sure all inspections have been put into system. Needs to provide blower door test results or the 3rd party airseal inspection report and post. Aslo post the correct energy cert with all required information. Also will need to look at inspection history for 3682 adam st. to see if a footing inspection was completed and who the inspector was that did the inspection. Please call me at ###-#### for more clarification. Thanks. Mike.
|
GCB-Energy | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PASS |
Mike Jordan
|
|
|
Jeremy ###-####
|
GCB-Framing | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Jim Sly
|
|
|
Jerremy ###-#### Need inspection as soon as possible
|
GCB-Framing | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PART |
Tom Arcoraci
|
|
|
Jeremy ###-#### Verify setbacks for fireplace vents walls are 3 ft or greater
|
GCB-Framing | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | PART |
Jim Sly
|
|
|
Jeremy ###-#### soffits...OK
|
Plan assigned to (SRZ) | 5/21/2013 | 5/21/2013 | 7/2/2013 | | DONE |
Sam Zahorka
|
|
|
Pending Mechanical to PASS. 1st review completed.
|
Routing - Mechanical Review | 7/2/2013 | | 7/2/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 7/2/2013 | | 7/2/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 7/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 6/28/2013 | | 6/28/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 6/27/2013 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plans marked A1, A2, A3, A4, A5, A6, A7, A8 & A9; Plans taken to Sam Zahorka for review
|
1st review completed | | | 5/29/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/28/2013 | | 5/29/2013 | | FAIL |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - Mechanical Review | 5/28/2013 | | 5/28/2013 | | FAIL |
Sam Zahorka
|
|
|
emailed correction to teds heating
|
Routing - Mechanical Review | 5/21/2013 | | 5/23/2013 | | FAIL |
Troy James
|
|
|
|
Application received | | | 5/15/2013 | | DONE |
|
|
|
|