Case Summary (GCB) | | | 10/22/2014 | | DONE |
|
|
|
|
GCB-Final | 10/16/2014 | 10/16/2014 | 10/16/2014 | P | DONE |
Bob Archibald
|
|
|
Corrections made ok.
|
GCB-Final | 10/15/2014 | 10/15/2014 | 10/15/2014 | A | FAIL |
Dave Hannah
|
|
|
Roof and soffit on south side of northern trailer. Requires D metail and exterior weather protection. Remainder of scope of work complete.
|
Case Summary (GCB) | | | 9/26/2014 | | |
|
|
|
|
GCB-Fndatn/slab ins/fld vent | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | CANC |
Dave Hannah
|
|
|
Richard ###-#### please call prior to let him know when inspector might be on site
|
Plan assigned to (SRZ) | 7/9/2014 | 7/9/2014 | 7/9/2014 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/9/2014 | | 7/9/2014 | | PASS |
Sam Zahorka
|
|
|
Plan Modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2014 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 7/7/2014 | | DONE |
Sam Zahorka
|
|
|
Received a telephone call from the applicant Richard Rodriguez. Explained to him he needed to pick up this permit, complete the work per the engineers scope and the Notice and Order, and then call for an inspection. Emailed the Notice and order to him also.
|
Telephone call | | | 7/7/2014 | | DONE |
Sam Zahorka
|
|
|
I spoke with Jeff at Garden City about the status of this permit. He stated he would check with Jenah since Erika was out of town and get back to me. It appears this permit is expired. This permit was only for structural repairs per a Notice and Order for the abatement of a dangerous building (GCA13-00001).
|
Meeting | | | 7/2/2014 | | DONE |
Sam Zahorka
|
|
|
Bob Archibald and I met at Garden City with Erika, Jeff, and Jenah about this project. It was identified in this meeting that permit GCA13-00001 (Notice and Order for the Abatement of Dangerous Building) was not paid for or picked up.
|
Plan resubmittals received | | | 6/29/2014 | | DONE |
Sam Zahorka
|
|
|
Received via email a revised engineers evaluation letter from the applicant Richard Rodriguez to remove a structural header from the scope of work for this repair permit. I called Garden City and spoke with them about how to proceed and the Status of this permit. It appeared to them this permit has not been picked up or paid for and has expired. I stated I could prepare a plan modification to this permit as soon as the original permit was picked up and paid for. I requested Garden City to notify me on how to proceed.
|
Issue and Courier | | | 1/23/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 6/6/2013 | 6/6/2013 | 1/17/2014 | | DONE |
Sam Zahorka
|
|
|
Pending Garden City extension - S.F. Mobile Home
|
Routing - PLAN CHECK | 6/6/2013 | | 1/17/2014 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 1/17/2014 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2014 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 6/4/2013 | | DONE |
|
|
|
|