Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB13-00081
StatusFinaled
Name AERO CONSTRUCTION
Site Address 5177 W CHINDEN BLVD
Project NameBLD2013-00079
Customer Number 
ePlanReviewNo
Description
(DUTCH BROS. COFFEE – Two story addition) Permit to add on to an existing 716 square foot office building by adding an additional 2,802 square feet (1,908 square foot to the first floor and 900 square feet to the second floor). The existing office appears to be a house that was converted to an office in the past. Plan approval is based on attached plan review report and structural engineering. Scope of work: construct new foundation, new exterior and interior walls, new slab on grade (first floor), new wood frame floor (second floor), new lighting, new mechanical, new plumbing, new windows, new accessible doors / hardware, and installation of new interior finishes. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final9/25/20149/26/20149/26/2014APASS
DetailsJim Sly
Eric ###-####
Structural final only.......OK
GCB-Final9/19/20149/19/20149/19/2014PPART
DetailsJim Sly
OK for Temp. Occ. OK for Perm Occ. When all other agencies have finaled.............and handrails are extended 11" past bottom step at stairway.
GCB-Final9/18/20149/18/20149/18/2014PNR
DetailsDave Hannah
GCB-Final9/16/20149/18/20149/18/2014PCANC
DetailsJim Sly
Eric ###-####
FIRE-Final Inspection9/16/20149/17/20149/17/2014APASS
DetailsCraig D. Hanson
Exit sign above door to storage room needs to be removed and checked by building inspector during final. no fire reinspection required.
GCB-Energy7/1/20147/1/20147/1/2014PPASS
DetailsTony Young
Eric ###-####,, see frame notes
GCB-Framing7/1/20147/1/20147/1/2014PPART
DetailsTony Young
Eric ###-####,, need to get full mech sign off per 411 note on chase,, need tempered glass on needed areas,, other issues resolved
GCB-Framing6/26/20146/27/20146/27/2014PFAIL
DetailsTony Young
Eric ###-####,, c/n posted,, ok to insulate walls,, need to get a letter of ok from engineer on shear as done,, ie: single studs for holddows, over shot nails, etc,, need full mechanical pass prior to cover,, need to support or justify truss on west wall, north end,,, need tempered glass within "24 of door,, need reviewed plans on site,, wood to be decay resistant when in contact of concrete,, (bearing or not),, need to verify seal pack at energy code inspection
GCB-Shearwall5/21/20145/21/20145/21/2014PFAIL
DetailsMike Jordan
Eric ###-####. renail areas were overshot. provide approved fix for missing holdowns.
GCB-Shearwall5/19/20145/20/20145/20/2014AFAIL
DetailsJim Sly
Brad ###-####
Need stamped approved plans for Wall Bracing.
GCB-Stem wall3/31/20144/1/20144/1/2014APASS
DetailsDave Hannah
MATT ###-####
GCB-Fndatn/slab ins/fld vent3/26/20143/27/20143/27/2014PCANC
DetailsTom Arcoraci
adam ###-####
GCB-Footing3/25/20143/26/20143/26/2014APASS
DetailsTom Arcoraci
Adam ###-#### plans to pour at noon
Routing - PLAN CHECK9/5/2013 9/5/2013 PASS
DetailsTim L. Woodard
Approved with Redlines. TLW
PLANS/APPL TAKEN TO FRONT DESK  9/5/2013 DONE
DetailsTim L. Woodard
Issue and Courier  9/5/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  8/21/2013  
Received 3 copies of additional calcs, 3 copies of sheets A1-1, A2-1, A2-3, A2-4, A2-5, A2-6, A3-1, A4-1, A4-2, A4-3, C1, C2, M0.0, M1.1, M2.1, M2.2, M3.1, E-1 and taken to Tim Woodard's desk
Routing - PLAN CHECK8/9/2013 8/9/2013 FAIL
DetailsTim L. Woodard
Plan resubmittals received  7/29/2013  
Received 2 copies of sheets A1-1, A2-1, A2-2, A2-3, A2-4, A2-5, A2-6, A3-1, A4-1, A4-2, A4-3, C1, M0.0, M1.1, M2.1, M2.2, M3.1, E-1, 2 copies of strucural calcs and taken to Tim Woodard's desk
1st review completed  6/21/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK6/12/2013 6/21/2013 PASS
DetailsTim L. Woodard
Refer to attached plan review report. TLW
Plan assigned to (SRZ)6/11/20136/11/20136/18/2013 DEFR
DetailsSam Zahorka
Plans Defered to Tim W
Application received  6/7/2013 DONE
Plan assigned to (TLW)6/18/2013    
DetailsTim L. Woodard
1st Review completed. TLW