GCB-Final | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Jim Sly
|
|
|
Eric ###-#### Structural final only.......OK
|
GCB-Final | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | PART |
Jim Sly
|
|
|
OK for Temp. Occ. OK for Perm Occ. When all other agencies have finaled.............and handrails are extended 11" past bottom step at stairway.
|
GCB-Final | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | NR |
Dave Hannah
|
|
|
|
GCB-Final | 9/16/2014 | 9/18/2014 | 9/18/2014 | P | CANC |
Jim Sly
|
|
|
Eric ###-####
|
FIRE-Final Inspection | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Craig D. Hanson
|
|
|
Exit sign above door to storage room needs to be removed and checked by building inspector during final. no fire reinspection required.
|
GCB-Energy | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Tony Young
|
|
|
Eric ###-####,, see frame notes
|
GCB-Framing | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PART |
Tony Young
|
|
|
Eric ###-####,, need to get full mech sign off per 411 note on chase,, need tempered glass on needed areas,, other issues resolved
|
GCB-Framing | 6/26/2014 | 6/27/2014 | 6/27/2014 | P | FAIL |
Tony Young
|
|
|
Eric ###-####,, c/n posted,, ok to insulate walls,, need to get a letter of ok from engineer on shear as done,, ie: single studs for holddows, over shot nails, etc,, need full mechanical pass prior to cover,, need to support or justify truss on west wall, north end,,, need tempered glass within "24 of door,, need reviewed plans on site,, wood to be decay resistant when in contact of concrete,, (bearing or not),, need to verify seal pack at energy code inspection
|
GCB-Shearwall | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | FAIL |
Mike Jordan
|
|
|
Eric ###-####. renail areas were overshot. provide approved fix for missing holdowns.
|
GCB-Shearwall | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | FAIL |
Jim Sly
|
|
|
Brad ###-#### Need stamped approved plans for Wall Bracing.
|
GCB-Stem wall | 3/31/2014 | 4/1/2014 | 4/1/2014 | A | PASS |
Dave Hannah
|
|
|
MATT ###-####
|
GCB-Fndatn/slab ins/fld vent | 3/26/2014 | 3/27/2014 | 3/27/2014 | P | CANC |
Tom Arcoraci
|
|
|
adam ###-####
|
GCB-Footing | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Tom Arcoraci
|
|
|
Adam ###-#### plans to pour at noon
|
Routing - PLAN CHECK | 9/5/2013 | | 9/5/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with Redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Issue and Courier | | | 9/5/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 8/21/2013 | | |
|
|
|
Received 3 copies of additional calcs, 3 copies of sheets A1-1, A2-1, A2-3, A2-4, A2-5, A2-6, A3-1, A4-1, A4-2, A4-3, C1, C2, M0.0, M1.1, M2.1, M2.2, M3.1, E-1 and taken to Tim Woodard's desk
|
Routing - PLAN CHECK | 8/9/2013 | | 8/9/2013 | | FAIL |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 7/29/2013 | | |
|
|
|
Received 2 copies of sheets A1-1, A2-1, A2-2, A2-3, A2-4, A2-5, A2-6, A3-1, A4-1, A4-2, A4-3, C1, M0.0, M1.1, M2.1, M2.2, M3.1, E-1, 2 copies of strucural calcs and taken to Tim Woodard's desk
|
1st review completed | | | 6/21/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/12/2013 | | 6/21/2013 | | PASS |
Tim L. Woodard
|
|
|
Refer to attached plan review report. TLW
|
Plan assigned to (SRZ) | 6/11/2013 | 6/11/2013 | 6/18/2013 | | DEFR |
Sam Zahorka
|
|
|
Plans Defered to Tim W
|
Application received | | | 6/7/2013 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/18/2013 | | | | |
Tim L. Woodard
|
|
|
1st Review completed. TLW
|