Permit Information
Permit NumberGCB13-00085
StatusFinaled
Name Nelson's RV
Site Address 5309 CHINDEN BLVD
Project NameBLD2013-00083
Customer Number 
ePlanReviewNo
Description
Nelson's R.V.'s - To construct a new 6,200 sq. ft., one story, pre-engineered metal building and related site improvements. Work to include: concrete footings, concrete foundations, concrete slab on grade floor, pre-engineered metal building, overhead doors, man doors, windows, and interior nonbearing walls. Two single user toilet rooms will also be constructed. All work per the approved plans, Engineering, and all other reviewing agencies approvals. Racking exceeding 8' in height is NOT approved under this permit. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/19/20143/20/20143/20/2014APASS
DetailsJim Sly
Dante ###-####
GCB-Final3/18/20143/19/20143/19/2014ANR
DetailsJim Sly
Dante ###-####
GCB-Ceiling Grid2/24/20142/24/20142/25/2014PPASS
DetailsDave Hannah
Dante ###-####
GCB-Fire Wall2/5/20142/5/20142/5/2014PPASS
DetailsJim Sly
East wall and columns....OK.
GCB-Framing2/4/20142/5/20142/5/2014APASS
DetailsJim Sly
GCB-Fire Wall2/4/20142/5/20142/5/2014ACANC
DetailsJim Sly
Dante ###-####.
GCB-Framing2/3/20142/4/20142/4/2014ACANC
DetailsJim Sly
Dante ###-####
Re-sched.......
GCB-Fire Wall2/3/20142/4/20142/4/2014ACANC
DetailsJim Sly
Dante ###-#### Re-sched.....
GCB-Framing1/30/20141/31/20141/31/2014APART
DetailsJim Sly
Dante ###-####
C/N posted
GCB-Fire Wall1/17/20141/21/20141/21/2014PPART
DetailsJim Sly
Dante ###-####
Double layer rock on East wall complete. Next step....columns.
GCB-Fire Wall1/16/20141/17/20141/17/2014APART
DetailsJim Sly
dANTE ###-####
OK for 2nd layer of rock between column 5 and 6 counting from the North. OK to install 1st layer between columns 4 to 5 and 6 to 7. Contr. to Provide letter from Architect ........rock to terminate at insulation in lieu of going all the way to the metal roof deck as shown on appr. plan.
GCB-Shearwall1/14/20141/15/20141/15/2014APART
DetailsJim Sly
Looked at inside of 1hr rated East wall. 1st layer of rock OK starting from the North end ......up to the 4th column. OK to install 2nd layer to this area. OK to install 1st layer of rock on remainder of East wall. Per detai B&C l...Page A 7.4 Shows UL 263 no.x649 Paintable firestop for columns? and also shows wrapping columns with rock.......But has been X'd out. Contractor wants to mix and match ...paint and wrap on select columns. Architect to get approval from City of Boise for using both these methods.
GCB-Framing1/13/20141/13/20141/13/2014PPART
DetailsMike Jordan
Dante ###-####
GCB-Energy1/13/20141/13/20141/13/2014PPASS
DetailsMike Jordan
Dante ###-####
GCB-Fire Wall12/17/201312/18/201312/18/2013APART
DetailsMike Jordan
Dante ###-####. East firewall, exterior 5/8 rock ok to cover.
GCB-Stem wall11/4/201311/5/201311/5/2013APART
DetailsMike Jordan
Dante ###-####. Special inspection.
GCB-Footing10/28/201310/28/201310/28/2013PPART
DetailsTony Young
Dante ###-#### Call first--needs inspected TODAY for concrete pour tomorrow.,, pending special inspection
GCB-Ceiling Grid9/20/20139/20/20139/23/2013PCANC
DetailsDave Hannah
Bill ###-####
Issue and Courier  9/19/2013 DONE
DetailsChristina Prado
Plan assigned to (SRZ)6/18/20136/18/20139/18/2013 DONE
DetailsSam Zahorka
Pending Structural to PASS. Building 1st review completed. Structural Review Pending.
Routing - PLAN CHECK9/18/2013 9/18/2013 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  9/18/2013 DONE
DetailsSam Zahorka
Routing Off Site - STRUCTURAL9/10/2013 9/13/2013 PASS
DetailsSam Zahorka
Called Action Courier for pick up on 9-10-13 @ 10:10am//BAS
Routing - PLAN CHECK8/28/2013 9/13/2013 PEND
DetailsSam Zahorka
Pending Garden City retention copy and structural plan review time amount.
Plan resubmittals received  9/9/2013  
Received 3 copies of revised foundation calcs, 3 copies of sheets F-1, F-2 and taken to Sam Zahorka's desk
Routing - PLAN CHECK8/27/2013 8/28/2013 PEND
DetailsSam Zahorka
Permit issuance pending structural review to PASS.
Routing Off Site - STRUCTURAL8/9/2013 8/27/2013 FAIL
DetailsSam Zahorka
Sent resubmittal comments to structural plan reviewer via email.
Plan resubmittals received  8/26/2013  
Received 3 copies of sheets A7.2 & A7.4 and taken to Sam Zahorka's desk
Routing - PLAN CHECK8/2/2013 8/9/2013 FAIL
DetailsSam Zahorka
Plan resubmittals received  8/7/2013  
1 copy of sheets A0.0, A1.1, A6.1, A7.2, A7.3, A7.4 and taken to San Zahorka's desk
Plan resubmittals received  8/2/2013 DONE
DetailsChristina Prado
received two sets of revised plans sheets marked A0.0, A1.1, A6.1, A7.2, A7.3 & A7.4 as well as response remarks;Plans taken to Sam for further review
Plan resubmittals received  7/29/2013  
Received 3 copies of sheets EL1.1, EN1.1 and taken to Sam Zahorka's desk
Routing Off Site - STRUCTURAL7/17/2013 7/26/2013 FAIL
DetailsSam Zahorka
Foundation Calculations and Supplemental calculations sent.
Plan resubmittals received  7/17/2013  
Received 1 copy of foundation calcs, 3 copies of Supplemental calcs and given to Sam Zahorka
Routing Off Site - STRUCTURAL6/26/2013 7/9/2013 FAIL
DetailsSam Zahorka
Corrections emailed to Garden City to Forward to the architect.
1st review completed  7/2/2013 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/20/2013 7/2/2013 FAIL
DetailsSam Zahorka
Sam Zahorka
Routing - Mechanical Review6/18/2013 6/20/2013 PASS
DetailsTroy James
Application received  6/14/2013 DONE