GCB-Final | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved. Structural final only ok.
|
GCB-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | NR |
Mike Jordan
|
|
|
Vaughn ###-#### call for access. contractor noted that this inspection was supposed to be a pm inspection?
|
GCB-Ceiling Grid | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | PASS |
Mike Jordan
|
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done.
|
GCB-Framing | 12/10/2013 | 12/10/2013 | 12/10/2013 | A | PASS |
Mike Jordan
|
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done. A framing inspection has been completed. They are listed under the footing inspections. (wrong inspection detail). Notes under these inspections do indicate framing was inspected.
|
GCB-Final | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | FAIL |
Mike Jordan
|
|
|
Ron ###-#### Make sure framing/and ceiling inspects are done and in system please. Provide panic hardware at rear exit, install exterior emergerncy lighting at front enterance, provide lock indicator at main enterance/exit. Also install the vertical grabbars in restrooms.
|
GCB-Footing | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Mike Jordan
|
|
|
Vaughn ###-####. soffitt is now ok to cover.
|
GCB-Footing | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | FAIL |
Mike Jordan
|
|
|
Vaughn ###-####. Provide RFI from architect for in place soffit framing, not per detail 6 on sheet A3.1. Correction notice posted.
|
Plan assigned to (SRZ) | 8/21/2013 | 8/21/2013 | 9/19/2013 | | DONE |
Sam Zahorka
|
|
|
1st Review Completed. Dickeys
|
Routing - PLAN CHECK | 9/19/2013 | | 9/19/2013 | | PASS |
Sam Zahorka
|
|
|
Received walk-in cooler/freezer info.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 9/19/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 9/16/2013 | | 9/17/2013 | | PEND |
Sam Zahorka
|
|
|
Pending walk-in cooler/freezer information.
|
Telephone call | | | 9/17/2013 | | DONE |
Sam Zahorka
|
|
|
I spoke with Garden City and the Project manager about the status of this permit. Emailed the building plan review report to the architect with clarifications on what items are still outstanding.
|
Plan resubmittals received | | | 9/16/2013 | | |
|
|
|
Received 1 copy of code comment response, 1 copy of sheet M1.0, MP1.0 and taken to Troy James's desk to add to the plans
|
Routing - Mechanical Review | 9/16/2013 | | 9/16/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/13/2013 | | |
|
|
|
Received 1 copy of mechanical plan review response, 1 copy of sheets M1.0, MP1.0 and taken to Sam Zahorka's desk
|
Telephone call | | | 9/10/2013 | | DONE |
Sam Zahorka
|
|
|
Called the contractor Vaughn and went over correction items needed prior to issuance.
|
Plan resubmittals received | | | 9/9/2013 | | |
|
|
|
Received 3 copies of structural calcs for roof equipment and taken to sam to insert into plans
|
Telephone call | | | 9/6/2013 | | DONE |
Sam Zahorka
|
|
|
Called the architect and went over needed corrections. I spoke with a Nikki.
|
Routing - PLAN CHECK | 8/22/2013 | | 9/6/2013 | | FAIL |
Sam Zahorka
|
|
|
Sam Zahorka
|
1st review completed | | | 9/6/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 8/21/2013 | | 8/22/2013 | | FAIL |
Troy James
|
|
|
emailed correction to applicant
|
Application received | | | 8/16/2013 | | DONE |
|
|
|
|