GCB-Final | 6/20/2014 | 6/23/2014 | 6/23/2014 | A | PASS |
Jim Sly
|
|
|
Curt ###-#### 1hr rated fire riser room OK and Engineering systems on structure, observed By Architect of record (Curt Barber) and approved as noted per letter dated June 18, 2014.
|
GCB-Courtesy | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | DONE |
Jim Sly
|
|
|
Curt ###-#### please call in advance to meet onsite Talked to Curt. Want Architect of record to provide fix for non-continuous 1 hr ceiling at riser room, and OK to butt rock against insulation at ext. walls. Want Eng. of record to provide final letter of approval for entire steel structure and all Engineering systems.
|
GCB-Energy | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Dave Hannah
|
|
|
Curt ###-#### energy for 4-foot walls only
|
GCB-Framing | 5/8/2014 | 5/8/2014 | 5/9/2014 | P | DONE |
Dave Hannah
|
|
|
Curt ###-#### late afternoon please call before
|
GCB-Framing | 5/8/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls ok.
|
GCB-Framing | 4/28/2014 | 4/29/2014 | 4/29/2014 | P | PEND |
Mike Jordan
|
|
|
Curt ###-####. contractor covering walls, no rough in inspections completed. Called curt and left message. Noted to contractor to not one side walls until all rough in and framing inspections have been completred.
|
GCB-Stem wall | 12/27/2013 | 12/30/2013 | 12/30/2013 | A | PASS |
Dave Hannah
|
|
|
Sean ###-####
|
GCB-Shearwall | 12/16/2013 | 12/17/2013 | 12/17/2013 | A | CANC |
Jim Sly
|
|
|
Shawn ###-####
|
GCB-Shearwall | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PEND |
Jim Sly
|
|
|
Shawn ###-#### retaining walls, call first Wanted to pour retaining walls at loading dock. Per cold weather concrete provisions.....I didn't allow them to pour because they were not willing to heat it fo three days.
|
GCB-Footing | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Tom Arcoraci
|
|
|
###-#### footings on retaining wall
|
GCB-Fndatn/slab ins/fld vent | 11/6/2013 | 11/6/2013 | 11/7/2013 | P | PASS |
Jim Sly
|
|
|
Shawn ###-####
|
GCB-Footing | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PASS |
Jim Storey
|
|
|
###-####
|
Plan resubmittals received | | | 10/11/2013 | | |
|
|
|
Received 1 copy of sheets C-3, A1.0 and taken to Sam Zahorka's desk
|
Plan assigned to (TLW) | 9/3/2013 | | 10/7/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/7/2013 | | 10/7/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/7/2013 | | 10/7/2013 | | PASS |
Tim L. Woodard
|
|
|
Did not route back to Out Source. Items were clarified by engineer. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Issue and Courier | | | 10/7/2013 | | DONE |
|
|
|
Plan taken to Garden City by Doug P.
|
Plan resubmittals received | | | 10/3/2013 | | |
|
|
|
Received 3 copies of plan review response letter to Tim Woodard ated 9-26-13 from Josh Howa, 3 copies of sheets G1.0, G2.0, C-1, C-2, C-3, C-4.1, C-4.2, C-5, A1.0, A1.3 and taken to Tim Woodard's desk
|
Routing - PLAN CHECK | 9/3/2013 | | 9/13/2013 | | FAIL |
Tim L. Woodard
|
|
|
Refer to Scutural Corrections and Plan Review Correction items included within the report. TLW
|
1st review completed | | | 9/13/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/22/2013 | | 9/13/2013 | | FAIL |
Tim L. Woodard
|
|
|
Called Action Courier for pick up on 8-22-13 @ 9:23am
|
Plan assigned to (SRZ) | 8/22/2013 | 8/22/2013 | 9/3/2013 | | DEFR |
Tim L. Woodard
|
|
|
Eberle Storage - Deferred to Tim Woodard
|
Routing - PLAN CHECK | 8/22/2013 | | 9/3/2013 | | PEND |
Sam Zahorka
|
|
|
Deferred to Tim Woodard
|
Application received | | | 8/19/2013 | | DONE |
|
|
|
|