GCB-Final | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PASS |
Jim Storey
|
|
|
###-#### Dillon
|
GCB-Footing | 9/14/2013 | 9/14/2013 | 12/31/2013 | A | PASS |
Tom Arcoraci
|
|
|
Per phone call from engineer ok for 16" footing instead of 23" per Tom Arcoraci
|
GCB-Framing | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Jim Sly
|
|
|
Dillon ###-#### Frame and Energy code.....OK.
|
GCB-Framing | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | PASS |
Jim Sly
|
|
|
Dylan ###-####
|
GCB-Shearwall | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Dave Hannah
|
|
|
Dillon ###-#### ok to cover the rest of the ext of the house
|
GCB-Shearwall | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PART |
Mike Jordan
|
|
|
Dillon ###-#### partial shear. 2nd. story walls.
|
GCB-Footing | 9/16/2013 | 9/16/2013 | 9/16/2013 | P | PASS |
Tom Arcoraci
|
|
|
Dylan ###-#### wall ok
|
GCB-Footing | 9/13/2013 | 9/16/2013 | 9/16/2013 | A | PART |
Tony Young
|
|
|
Andy ###-####
|
GCB-Fndatn/slab ins/fld vent | 9/12/2013 | 9/13/2013 | 9/13/2013 | P | FAIL |
Tom Arcoraci
|
|
|
Andrew ###-#### no plans and or footing width not changed to 23 in
|
GCB-Footing | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | PEND |
Dave Hannah
|
|
|
Dylan ###-#### plans call for 23 inch wide ftgs crew built 16 inch wide set backes ok they will check with engin befor placing concrete made two trips to site today
|
Plan assigned to (SRZ) | 8/26/2013 | 8/26/2013 | 9/9/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed.
|
Plan resubmittals received | | | 9/9/2013 | | |
|
|
|
Received 3 copies of 3rd floor framing plan, 3 copies of sheets 1, 2, 3, 4, 5, 6, 7 and taken to Sam Zahorka's desk
|
Routing - PLAN CHECK | 9/9/2013 | | 9/9/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 9/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 8/27/2013 | | 8/28/2013 | | FAIL |
Sam Zahorka
|
|
|
Sam Zahorka
|
Routing - Mechanical Review | 8/28/2013 | | 8/28/2013 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 8/28/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 8/26/2013 | | 8/27/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to lloyd A1 heating
|
Application received | | | 8/22/2013 | | DONE |
|
|
|
|