GCB-Final | 3/21/2014 | 3/21/2014 | 3/24/2014 | P | PASS |
Tom Arcoraci
|
|
|
travis ###-#### struc final ok
|
GCB-Framing | 1/23/2014 | 1/24/2014 | 1/24/2014 | A | PASS |
Jim Sly
|
|
|
Travis ###-#### Talked to travis. He said Tony went through the framing and said it was OK.....except for a strap at double top plate and rough-in approvals from all trades. These are done. I walked through frame....appears OK.
|
GCB-Framing | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | PEND |
Tony Young
|
|
|
Travis ###-####,, need trades
|
GCB-Footing | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Tony Young
|
|
|
Travis ###-####
|
GCB-Final | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | PART |
Mike Jordan
|
|
|
###-#### This is for temporary C of O for office portion only. Temp occ. ok only for front office and bathrooms on existing 2nd. level. must have all other trades signed off as temp. occ also.
|
GCB-Final | 12/12/2013 | 12/13/2013 | 12/13/2013 | P | CANC |
Mike Jordan
|
|
|
Cancelled via phone cal from contractor.
|
Plan assigned to (SRZ) | 11/27/2013 | 11/27/2013 | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
Plan mod 1st review complete. Need Engineer Calculations and new design professional statement from the owner.
|
Telephone call | | | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
Called Travis the contractor back and let him know a Final inspection could not happen until plan modifications for the 2nd floor is approved. He stated the front office portion should of been separated from the rear portion scope for permitting. I then called Garden CIty and requested separate permits for the front office work so a final could be scheduled for this work only removeing the rear portion with a new permit of its own. OR maybe a temp occ could be granted until rear portion is completed. Lori said she would let me know and call me back.
|
Plan resubmittals received | | | 12/13/2013 | | |
|
|
|
Received 4 copies of sheets S0.1, S1.1, S5.1, 4 copies of packet with a 2 page letter from Gregory Leishman to Jeff Likes dated 12-10-13, form 310, ICC-ES Evaluation Report ESR2508 for concrete anchors (17 pgs), ICC-ES Evaluation Report ESR2713 for concrete anchors, structural calcs and taken to Sam Zahorka's desk
|
Routing - PLAN CHECK | 12/13/2013 | | 12/13/2013 | | PASS |
Sam Zahorka
|
|
|
Plan modification final review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/13/2013 | | DONE |
Barbara Stitt
|
|
|
Issue plan modification
|
Routing - PLAN CHECK | 11/27/2013 | | 12/4/2013 | | FAIL |
Sam Zahorka
|
|
|
Need structural calculations and a new design professional in responsible charge statement from the owner.
|
Plan resubmittals received | | | 11/27/2013 | | |
|
|
|
Received 4 copies of sheets A1.1, S0.1, S1.1, S5.1 and taken to Sam Zahorka's desk
|
GCB-Framing | 11/26/2013 | 11/26/2013 | 11/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Travis ###-#### call first
|
GCB-Framing | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PART |
Mike Jordan
|
|
|
###-#### call first. Interior wood framed walls for new offices, 1st and 2nd. floor phase 1. Pending electrical rough in inspections. No cover on upstairs restrooms.
|
Plan assigned to (SRZ) | 9/23/2013 | 9/23/2013 | 10/23/2013 | | DONE |
Sam Zahorka
|
|
|
1st review completed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 10/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 10/21/2013 | | 10/21/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 10/15/2013 | | |
|
|
|
Received 3 copies of sheetsG-001, G-002, G-003, A-101, A-102, A-103, A-111, A-112, A-113, A-114, A-115, A-121, A-122, A-131, A-141, A-211, A-311, A-321, A-421, A-521, A-522, A-601, A-721 and taken to Sam Zahorka's desk
|
Routing - PLAN CHECK | 9/23/2013 | | 10/8/2013 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 10/8/2013 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 9/18/2013 | | DONE |
|
|
|
|