GCB-Final | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PASS |
Tony Young
|
|
|
Mike ###-####,, ok for a c of o
|
GCB-Energy | 2/3/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Jim Sly
|
|
|
Mike ###-####
|
GCB-Final | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | CANC |
Dave Hannah
|
|
|
Mike ###-####
|
GCB-Framing | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Dave Hannah
|
|
|
|
GCB-Final | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | FAIL |
Mike Jordan
|
|
|
Mike ###-####. CPmplete airseal on top plates at tall wall, plumbing penetration at top plate by alcove in mud room and linsets at second floor in mech. chase. Also provide the truss engineering so that framing inspection can be completed. Correction notice was posted.
|
Plan resubmittals received | | | 1/16/2014 | | DONE |
|
|
|
new manual j
|
Routing - Mechanical Review | 1/16/2014 | | 1/16/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
CHANGE STATUS TO (ISS) | | | 1/16/2014 | | DONE |
|
|
|
|
GCB-Shearwall | 12/20/2013 | 12/23/2013 | 12/23/2013 | P | PASS |
Mike Jordan
|
|
|
Mike ###-#### call first. Exterior shear walls ok. Engineer has provided staple conversion and has accepted the in place holddowns.. Ok to cover exterior walls.
|
GCB-Shearwall | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | FAIL |
Mike Jordan
|
|
|
Mike ###-####. Provide engineering with approved plans. Engineer to review capacity of the STDH14 straps in lieu of the lstHD8 as shown on approved plans, also provide a staple conversion were staples were used on type 1 shear walls in leiu of nails. No cover at this time.
|
GCB-Shearwall | 12/18/2013 | 12/19/2013 | 12/19/2013 | A | FAIL |
Tony Young
|
|
|
Mike ###-####,, on site conf with the builder,, need to complete nailing all of the job,, then recall inspection
|
GCB-Shearwall | 12/16/2013 | 12/17/2013 | 12/17/2013 | A | NR |
Jim Sly
|
|
|
Mike ###-#### call for gate access; give hour notice if possible
|
GCB-Shearwall | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | NR |
Jim Sly
|
|
|
Mike ###-#### Talked to Mike........ Straps not nailed, missed blocking etc. Need walk job with framers.....then cal for insp.
|
GCB-Footing | 11/15/2013 | 11/15/2013 | 11/18/2013 | P | PART |
Tony Young
|
|
|
Heron ###-#### after 3:30, inspection on garage modification footings,, work in progress,, ok
|
Plan assigned to (SRZ) | 11/6/2013 | 11/6/2013 | 11/12/2013 | | DONE |
Sam Zahorka
|
|
|
Plan Modification
|
Routing - PLAN CHECK | | | 11/12/2013 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2013 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Mechanical Review | 11/6/2013 | | 11/6/2013 | | PASS |
Troy James
|
|
|
no mechanical
|
Plan resubmittals received | | | 11/6/2013 | | |
|
|
|
Received 3 copies of sheets A1, A2, A3, A4, A6, A7, A8, A9 and started new routing
|
GCB-Footing | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Tom Arcoraci
|
|
|
Heron ###-#### Would like late afternoon, call first.
|
Issue and Courier | | | 10/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 10/8/2013 | 10/8/2013 | 10/11/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 10/9/2013 | | 10/11/2013 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
1st review completed | | | 10/11/2013 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 10/8/2013 | | 10/9/2013 | | PASS |
Troy James
|
|
|
|
Application received | | | 10/7/2013 | | DONE |
|
|
|
|