Permit Information
Permit NumberGCB13-00143
StatusFinaled
Name VN Properties
Site Address 9233 W STATE
Project NameBLD2013-00141
Customer Number 
ePlanReviewNo
Description
KM Engineering - ** 6-19-14 PLAN MODIFICATION TO INCLUDE: CONSTRUCT OFFICE WALLS NOTED AS FUTURE; REMOVE THE EAST EXTERIOR DOUBLE DOORS; AND CREAT TO CORRIDOR OPENINGS AS RED-LINED ON SHEET A1.0. SRZ** - To increase this tenants area by an additional 4,185 square feet by expanding into the adjacent tenant space and constructing a new 2nd floor per plans. This project is divided into two phases. Phase 1 will increase the 1st floor area of the existing tenant space by an additional 1,793 square feet for immediate occupancy. Phase 1 work will include: installation of new 2nd floor structure; pouring 1st floor concrete slab; create a new 5'X7' opening and 3'-6"X3' opening for a sliding window in the existing tenant demising wall; construct new interior walls to create new offices, conference room, two new men’s and women’s accessible restrooms, and entry; construct new stairs to the 2nd floor addition; new suspended ceiling grid system installed per CISCA guidelines; related interior finishes in compliance with chapter 8 of the 2009 IBC; mechanical, plumbing, and electrical rough-in for phase 2. Phase 2 will complete development of the 903 square foot office space on the 1st floor and 1,489 square foot open office area on the second floor. Phase 2 work will include: create a new 3'X7' opening in the existing tenant separation wall at the 2nd floor level; construct new interior walls to create new offices and a conference room; complete mechanical, plumbing, and electrical work. All
work per the approved plans, attached plan review report, and other reviewing agencies approvals. A Final Certificate of Occupancy with the new occupant load total is to be issued when Phase 1 and Phase 2 is completed. Note: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final6/23/20146/24/20146/24/2014APASS
DetailsJim Sly
Bob ###-####
Structural final OK.
Plan assigned to (SRZ)6/19/20146/19/20146/20/2014 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/20/2014 DONE
DetailsSam Zahorka
Issue and Courier  6/20/2014 DONE
DetailsChristina Prado
Routing - PLAN CHECK6/19/2014 6/19/2014 PASS
DetailsSam Zahorka
PLAN MODIFICATION
Plan resubmittals received  6/19/2014 DONE
DetailsChristina Prado
****PLAN MODIFICATION**** Received three complete sets of plans, routed to Sam for review
GCB-Final6/12/20146/12/20146/12/2014PPART
DetailsTony Young
Bob ###-#### please call prior so he can meet on site,, temp occ ok.. will need to submit a plan modification to include main level completion on north side offices,, (was going to be part of phase 2),, 2nd floor area will be closed off,, no handrails/guard rails at this time,, ok other than noted items. tha th
GCB-Framing4/23/20144/24/20144/24/2014APASS
DetailsMike Jordan
Bob ###-####. All framing issues resolved. Also performed energy code inspection as well.
GCB-Framing4/18/20144/18/20144/18/2014PPART
DetailsTony Young
Bob ###-####,, need fire blocks at ceiling line (9'),, need mechanical full pass
Plan assigned to (SRZ)10/15/201310/15/20132/7/2014 DONE
DetailsSam Zahorka
2nd review completed. - (KM Engineering)
Routing - PLAN CHECK2/7/2014 2/7/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/7/2014 DONE
DetailsSam Zahorka
Issue and Courier  2/7/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK  2/6/2014 FAIL
DetailsSam Zahorka
Routing - Plumbing Review2/4/2014 2/5/2014 PASS
DetailsDaryl Spivey
No plumbing plan to review
Routing - Mechanical Review1/31/2014 2/4/2014 PASS
DetailsTroy James
Plan resubmittals received  1/31/2014  
Received 2 copies of plan reveiw response letter dated 1-20-14 from Curtis Crystal to Sam Zahorka, 3 copies of G1.0, EN1.0A1.0, A1.1, A3.0, A4.0, E0.0, E2.0L, E2.0MP, E2.0P, E2.0S, E3.0, E4.0, E4.1E4.2, M1.0, M2.0, M3.0, S1.0, S2.0, S3.0 and taken to Mechanical for review
Routing - PLAN CHECK10/21/2013 11/6/2013 FAIL
DetailsSam Zahorka
1st review completed  11/6/2013 DONE
DetailsSam Zahorka
Routing - Mechanical Review10/16/2013 10/21/2013 PASS
DetailsTroy James
Application received  10/11/2013 DONE