GCB-Final | 5/21/2014 | 5/22/2014 | 5/22/2014 | P | PASS |
Jim Sly
|
|
|
Please call for access code ###-#### Structural final only..........OK.
|
GCB-Footing | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | NR |
Dave Hannah
|
|
|
Brandon ###-####
|
GCB-Energy | 2/19/2014 | 2/20/2014 | 2/20/2014 | P | PASS |
Tom Arcoraci
|
|
|
Grey ###-####
|
GCB-Framing | 2/14/2014 | 2/18/2014 | 2/18/2014 | A | PASS |
Jim Sly
|
|
|
Grey ###-####
|
CHANGE STATUS TO (ISS) | | | 2/18/2014 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 2/14/2014 | | |
|
|
|
Received 3 copies of sheets Cover sheet, A0.1, A0.2, A1.0, A1.1, A1.2, A1.3, A1.4, A2.0, A3.0, A4.0, A5.0, A5.1, A5.2, A6.0 and 3 small 81/2 x 11 size sheet of the cover sheet, then taken to Sam Zahorka's desk
|
Plan resubmittals received | | | 2/12/2014 | | DONE |
|
|
|
new manual j
|
Routing - Mechanical Review | 2/12/2014 | | 2/12/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
GCB-Fndatn/slab ins/fld vent | 1/6/2014 | 1/7/2014 | 1/7/2014 | A | PASS |
Jim Sly
|
|
|
Ben ###-####
|
GCB-Footing | 12/31/2013 | 1/2/2014 | 1/2/2014 | A | PASS |
Dave Hannah
|
|
|
Ben ###-####
|
GCB-Footing | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | FAIL |
Mike Jordan
|
|
|
J Jones ###-####. Noted several areas within the footing footprint were soils are not adequatley compacted. 6 to 12 inches in some areas. Either compact loose soils or excavate to endisturbed native soils.
|
Plan assigned to (SRZ) | 12/4/2013 | 12/4/2013 | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 12/5/2013 | | 12/13/2013 | | PASS |
Sam Zahorka
|
|
|
Sam Zahorka
|
1st review completed | | | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2013 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 12/13/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Mechanical Review | 12/4/2013 | | 12/5/2013 | | PASS |
Troy James
|
|
|
|
Application received | | | 12/3/2013 | | DONE |
|
|
|
|