GCB-Final | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Dave Hannah
|
|
|
Dillon ###-####
|
GCB-Final | 3/10/2015 | 3/11/2015 | 3/12/2015 | P | PEND |
Dave Hannah
|
|
|
Dillon ###-#### needs close risers to less than 4 inchs on front stairs and hand rail at bottom
|
GCB-Final | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | CANC |
Phil Shearer
|
|
|
Dillon ###-####
|
GCB-Energy | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | PASS |
Phil Shearer
|
|
|
Dillon ###-####
|
GCB-Framing | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | PASS |
Phil Shearer
|
|
|
Dillon ###-####
|
GCB-Final | 11/5/2014 | 11/5/2014 | 11/5/2014 | A | NR |
Dave Hannah
|
|
|
Dillon Schneider ###-#### - requested framing final and insulation inspection
|
GCB-Framing | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | FAIL |
Mike Jordan
|
|
|
Dillon ###-####. Complete all fireblocking, provide additional studs under 3rd. floor beam by stairs. Provide engineering for king studs at ground floor window opening picking up 2nd and 3rd. floor loads. ok to insulate.
|
Plan resubmittals received | | | 10/17/2014 | | DONE |
|
|
|
new manual j report
|
Routing - Mechanical Review | 10/17/2014 | | 10/17/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
GCB-Shearwall | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PART |
Jim Sly
|
|
|
Dylan ###-#### All Exterior shear nailing.......OK
|
GCB-Footing | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | PASS |
Dave Hannah
|
|
|
Andy ###-#### requesting for around 10AM planter ftgs ok
|
GCB-Footing | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PASS |
Mike Jordan
|
|
|
Andy ###-####. Inspected aditional column pad footings that were missed. Also discused contractors plan on making sure that structural memembers will bear on footings once backfill has taken place.
|
GCB-Footing | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PART |
Dave Hannah
|
|
|
###-#### ext ftgsok but needs to dig out peir pads
|
Issue and Courier | | | 2/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 1/28/2014 | 1/28/2014 | 2/6/2014 | | DONE |
Sam Zahorka
|
|
|
1st review completed
|
Routing - PLAN CHECK | 2/5/2014 | | 2/6/2014 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2014 | | DONE |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 2/5/2014 | | |
|
|
|
Recceived 3 copies of sheets A1.0, A3.0, A8.0 and taken to Sam Zahorka's desk
|
Routing - PLAN CHECK | 1/29/2014 | | 1/31/2014 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 1/31/2014 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 1/28/2014 | | 1/29/2014 | | PASS |
Troy James
|
|
|
|
Application received | | | 1/24/2014 | | DONE |
|
|
|
|