Permit Information
Permit NumberGCB14-00010
StatusFinaled
Name Custom Steel Structures
Site Address 123 E 40TH ST
Project NameBLD2014-00010
Customer Number 
ePlanReviewNo
Description
**1/5/15 PLAN MODIFICATION TO INCLUDE ADDING EXTERIOR WINDOWS AND DOORS TO THIS BUILDING. SRZ** To construct an engineered 80' X 50', 4,000 square foot, one story, pole structure and attach to an existing single family dwelling per plans. The engineered pole structure will be constructed using 6X pressure treated posts w/ concrete footings; 2X6 wall girts @ 24" o.c. between posts; 2X6 roof joist @ 24" o.c. between the 2-ply pre-engineered girder trusses; concrete slab floor; Metal roofing and siding. All work per the approved plans, attached engineering and plan review report. This is a non-conditioned building and was not reviewed for energy conservation requirements. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/28/20151/28/20151/28/2015PPASS
DetailsDave Hannah
Curt ###-#### - call for access
Plan assigned to (SRZ)1/5/20151/5/20151/27/2015 DONE
DetailsSam Zahorka
Routing - PLAN CHECK1/27/2015 1/27/2015 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/27/2015 DONE
DetailsSam Zahorka
Issue and Courier  1/27/2015 DONE
DetailsCandy A. Nichols
Plan resubmittals received  1/26/2015 DONE
DetailsCandy A. Nichols
received 3 sets of sheet A1.0 & 3 struc calcs-took to Sam Z
Routing - PLAN CHECK12/23/2014 1/5/2015 FAIL
DetailsSam Zahorka
Need Engineer of record to identify new openings in this engineered building.
Plan resubmittals received  12/23/2014 DONE
DetailsCandy A. Nichols
received plan mod-3 sheets of A2.0-took to Sam Z
GCB-Final12/12/201412/15/201412/16/2014PFAIL
DetailsDave Hannah
Curt Barber. Final inspection reveled that changes had been made to the exterior elevations: additional doors and windows were added that wre not indicated on approved plans. The structure has upper story windows and no 2nd floor there is also no electrical, plumbing or mechanical installations and separate permits will be required. A correction notice was issued to supply new elevation drawings for review and approval.
GCB-Final9/10/20149/10/20149/10/2014PPEND
DetailsDave Hannah
A final reinspection is required.
CHANGE STATUS TO (ISS)  9/10/2014 PEND
DetailsDave Hannah
After re-review of the approved construction documents and scope of work on permit it has been determined that the final building inspection was completed in error. The structure lacks the required doors and attached covered walkway between the existing dwelling and new pole structure. A final reinspection is required.
GCB-Final8/1/20148/1/20148/1/2014PPASS
DetailsDave Hannah
Curt ###-####
GCB-Framing7/7/20147/8/20147/8/2014APASS
DetailsJim Sly
Joe ###-#### late morning please
GCB-Footing6/19/20146/20/20146/20/2014APASS
DetailsMike Jordan
curt ###-#### footing and setbacks call for location of plans
Plan assigned to (SRZ)1/30/20141/30/20142/7/2014 DONE
DetailsSam Zahorka
1st review completed
Plan resubmittals received  2/7/2014  
Received 1 copy of structural calcs and taken to Sam Zahorkas desk
Routing - PLAN CHECK2/7/2014 2/7/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  2/7/2014 DONE
DetailsSam Zahorka
Issue and Courier  2/7/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK1/30/2014 2/5/2014 FAIL
DetailsSam Zahorka
1st review completed  2/5/2014 DONE
DetailsSam Zahorka
Application received  1/29/2014 DONE