GCB-Final | 1/28/2015 | 1/28/2015 | 1/28/2015 | P | PASS |
Dave Hannah
|
|
|
Curt ###-#### - call for access
|
Plan assigned to (SRZ) | 1/5/2015 | 1/5/2015 | 1/27/2015 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 1/27/2015 | | 1/27/2015 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2015 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 1/27/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 1/26/2015 | | DONE |
Candy A. Nichols
|
|
|
received 3 sets of sheet A1.0 & 3 struc calcs-took to Sam Z
|
Routing - PLAN CHECK | 12/23/2014 | | 1/5/2015 | | FAIL |
Sam Zahorka
|
|
|
Need Engineer of record to identify new openings in this engineered building.
|
Plan resubmittals received | | | 12/23/2014 | | DONE |
Candy A. Nichols
|
|
|
received plan mod-3 sheets of A2.0-took to Sam Z
|
GCB-Final | 12/12/2014 | 12/15/2014 | 12/16/2014 | P | FAIL |
Dave Hannah
|
|
|
Curt Barber. Final inspection reveled that changes had been made to the exterior elevations: additional doors and windows were added that wre not indicated on approved plans. The structure has upper story windows and no 2nd floor there is also no electrical, plumbing or mechanical installations and separate permits will be required. A correction notice was issued to supply new elevation drawings for review and approval.
|
GCB-Final | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PEND |
Dave Hannah
|
|
|
A final reinspection is required.
|
CHANGE STATUS TO (ISS) | | | 9/10/2014 | | PEND |
Dave Hannah
|
|
|
After re-review of the approved construction documents and scope of work on permit it has been determined that the final building inspection was completed in error. The structure lacks the required doors and attached covered walkway between the existing dwelling and new pole structure. A final reinspection is required.
|
GCB-Final | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Dave Hannah
|
|
|
Curt ###-####
|
GCB-Framing | 7/7/2014 | 7/8/2014 | 7/8/2014 | A | PASS |
Jim Sly
|
|
|
Joe ###-#### late morning please
|
GCB-Footing | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Mike Jordan
|
|
|
curt ###-#### footing and setbacks call for location of plans
|
Plan assigned to (SRZ) | 1/30/2014 | 1/30/2014 | 2/7/2014 | | DONE |
Sam Zahorka
|
|
|
1st review completed
|
Plan resubmittals received | | | 2/7/2014 | | |
|
|
|
Received 1 copy of structural calcs and taken to Sam Zahorkas desk
|
Routing - PLAN CHECK | 2/7/2014 | | 2/7/2014 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2014 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 2/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 1/30/2014 | | 2/5/2014 | | FAIL |
Sam Zahorka
|
|
|
|
1st review completed | | | 2/5/2014 | | DONE |
Sam Zahorka
|
|
|
|
Application received | | | 1/29/2014 | | DONE |
|
|
|
|