GCB-Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Mike Jordan
|
|
|
Dan ###-####. All issues resolved. Structural final ok.
|
GCB-Final | 8/26/2014 | 8/27/2014 | 8/27/2014 | P | FAIL |
Mike Jordan
|
|
|
Dan ###-####. Handrail at top of stairs needs to return into wall. Firecaulk wires from garage door opener at garage lid. Provide blower door test results or 3rd party airseal inspection report and post. Coorection notice issued and posted on electrical panel in garage.
|
CHANGE STATUS TO (ISS) | | | 8/27/2014 | | DONE |
Sam Zahorka
|
|
|
|
GCB-Framing | 6/13/2014 | 6/13/2014 | 6/19/2014 | P | DEFR |
Dave Hannah
|
|
|
Dan ###-#### plans in fireplace at 460 51st
|
GCB-Energy | 6/13/2014 | 6/13/2014 | 6/19/2014 | P | DEFR |
Dave Hannah
|
|
|
Dan ###-#### plans in fireplace at 460 51st
|
GCB-Framing | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | CANC |
Mike Jordan
|
|
|
Dan ###-#### plans in fireplace at 46 East 51st
|
GCB-Energy | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | PASS |
Mike Jordan
|
|
|
Dan ###-#### plans in fireplace at 460 E 51st
|
GCB-Framing | 6/11/2014 | 6/12/2014 | 6/12/2014 | P | PASS |
Dave Hannah
|
|
|
DAN FRENCH ###-####
|
Plan resubmittals received | | | 6/10/2014 | | DONE |
|
|
|
new manual j
|
Routing - Mechanical Review | 6/10/2014 | | 6/10/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
GCB-Courtesy | 5/20/2014 | 5/21/2014 | 5/22/2014 | P | DONE |
Jim Sly
|
|
|
Dan French ###-#### call to meet onsite to discuss sheetrock adjacent ot two hour firewall
|
GCB-Framing | 5/19/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Jim Sly
|
|
|
Dan French ###-####
|
GCB-Shearwall | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PASS |
Tom Arcoraci
|
|
|
Dan ###-#### re-inspect
|
GCB-Shearwall | 4/30/2014 | 5/1/2014 | 5/1/2014 | P | FAIL |
Mike Jordan
|
|
|
Dan 602.3255. Please provide approved plans. Also provide 5/8type x rock at soffits at 2hr. firewalls. Correction notice posted.
|
GCB-Fire Wall | 4/9/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Mike Jordan
|
|
|
Dan ###-#### first layer on, check nailing before second layer. Base layer, 1st. floor ok.
|
GCB-Footing | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Jim Sly
|
|
|
|
Plan assigned to (SRZ) | 2/4/2014 | 2/4/2014 | 2/18/2014 | | DONE |
Sam Zahorka
|
|
|
1st review completed. Corrections needed.
|
Routing - PLAN CHECK | 2/14/2014 | | 2/18/2014 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2014 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 2/18/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/14/2014 | | |
|
|
|
Received 3 copies of Elevations sheet and Roof framing sheet and taken to Sam Zahorka's desk
|
Routing - PLAN CHECK | 2/7/2014 | | 2/11/2014 | | FAIL |
Sam Zahorka
|
|
|
Sam Zahorka
|
1st review completed | | | 2/11/2014 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 2/4/2014 | | 2/7/2014 | | PASS |
Troy James
|
|
|
|
Application received | | | 2/3/2014 | | DONE |
|
|
|
|