Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberGCB14-00062
StatusFinaled
Name ALC Architecture
Site Address 207 E 38TH ST Unit: Operations Cent
Project NameBLD2014-00062
Customer Number 
ePlanReviewNo
Description
""MODIFICATION TO CHANGE THE GAS PIPING FROM LOW PRESSURE TO HIGH PRESSURE"" Garden City Public Works Operations Center TI - Permit to construct a 616 sq.ft. conference room within an existing warehouse area per the approved plans. Work to inlcude: construct interior walls to create the new conference room; install new door and associated hardware; construct a ceiling over the new conference room per plans; and electrical and mechanical work. All work per the approved plans, attached plan review report, adopted codes, and all other reviewing agencies final approvals. This building is fully fire sprinklered. A separate fire sprinkler permit will be required for the necessary fire protection modifications; as regulated by the Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final6/16/20166/17/20166/17/2016PPASS
DetailsDave Hannah
Miquel ###-####
FIRE-Final Inspection6/16/20166/16/20166/17/2016PPASS
DetailsKatie Marron
Fire Life Safety Pass
Routing - Mechanical Review5/10/2016 5/12/2016 PASS
DetailsTroy James
Routing - PLAN CHECK5/12/2016 5/12/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/12/2016 DONE
Issue and Courier  5/12/2016 DONE
plan mod done-called courier to take back to GC
Plan resubmittals received  5/9/2016 DONE
Plan Mod submitted 2 set of sheet M1.0 and the top sheet of the permit app-took to Carl M
GCB-Framing4/6/20164/7/20164/7/2016APASS
DetailsDave Hannah
Mike ###-####
Plan assigned to (SRZ)6/5/20146/5/20147/31/2014 DONE
DetailsSam Zahorka
1st review completed.
Routing - PLAN CHECK7/31/2014 7/31/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/31/2014 DONE
DetailsSam Zahorka
Issue and Courier  7/31/2014 DONE
DetailsBarbara Stitt
Plan resubmittals received  7/30/2014  
Received 2 copies of the following sheets-G1.0, A0.1, A1.1, M1.0, E0.0, E1.0, 1 copy of the following sheets on 8 1/2 X 11--A1.0, C1.0, A2.0, A2.1, A2.2, A2.2B, A2.3, A2.4, A2.5, A3.0M1.0, M2.0, M3.0, M4.0, M5.0, E1, E2, E3, 1 copy of plan review report and response stamped and taken to Sam Zahorka's desk
1st review completed  6/24/2014 DONE
DetailsSam Zahorka
Failed Building
Routing - PLAN CHECK6/11/2014 6/24/2014 FAIL
DetailsSam Zahorka
Routing - PLAN CHECK6/9/2014 6/24/2014 PEND
DetailsSam Zahorka
Routing - FIRE6/5/20146/5/20146/11/2014 PASS
DetailsScott Arellano
No separate comments attached. Plans are approved with red lined annotations regarding fire extinguisher and necessary fire sprinkler permit.
Routing - Mechanical Review6/5/2014 6/9/2014 PASS
DetailsTroy James
Routing - Public Works6/5/20146/5/20146/5/2014 PASS
DetailsBeverly Mountain
Application received  6/3/2014 DONE