Permit Information
Permit NumberGCB14-00076
StatusFinaled
Name Dan McCown
Site Address 304 E 39TH ST
Project NameBLD2014-00076
Customer Number 
ePlanReviewNo
Description
*** 8/29/14 PLAN MODIFICATION TO INCLUDE AN ENGINEERED FLOOD HAZARD FOUNDATION DESIGN TO INCLUDE ENCLOSED AREA BELOW DESIGN FLOOD ELEVATION. EXTERIOR WALL FLOOD OPENINGS ARE PROVIDED.*** To pour 174 lineal foot of footings/foundation walls for relocation of a 1,414 sq. ft. from 2005 N. 20th Street per approved plans, attached plan review report, and all other reviewing agencies final approvals. The Building Official has determined carbon monoxide poisoning, smoke and fire related hazards to be specific hazards associated with buildings and/or structures without smoke and carbon monoxide detection and alarm systems that do not meet current building codes. Carbon monoxide poisoning, smoke and fire related hazards are substantial hazards because the likelihood of death and or injury from said hazards increases in buildings and/or structures. The existing portions of buildings or structures with non-existent or inadequate smoke and carbon monoxide detection and alarm systems that do not meet current building codes must be retrofitted to meet current code requirements. This lot is within a Floodplain area. An elevation certificate is required to be submitted and approved prior to calling for a framing inspection. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/25/20161/25/20161/25/2016PPASS
DetailsDave Hannah
Sean ###-####
GCB-Final1/4/20161/4/20161/5/2016PFAIL
DetailsDave Hannah
Shaun ###-#### needs co2 detector insulation and vis queen crawl flood plan cert address
GCB-Fndatn/slab ins/fld vent9/23/20149/24/20149/25/2014PPASS
DetailsDave Hannah
Anton ###-####
GCB-Footing9/22/20149/23/20149/23/2014PDEFR
DetailsMike Jordan
Anton ###-####. Contractor did not have approved plans on site. Noted to concrete subcontractor, that if he decides to place concrete, he is proceeding at his own risk. Approved plans must be on site for stemwall inspection.
Plan assigned to (SRZ)8/27/20148/27/20148/29/2014 DONE
DetailsSam Zahorka
Routing - PLAN CHECK8/27/2014 8/29/2014 PASS
DetailsSam Zahorka
CHANGE STATUS TO (REV)  8/29/2014  
DetailsSam Zahorka
Plan Modification submitted.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2014 DONE
DetailsSam Zahorka
Telephone call  8/29/2014 DONE
DetailsCandy A. Nichols
called Action Currier at 3:30 to take plans Garden City
Issue and Courier  8/29/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals received  8/27/2014 DONE
DetailsChristina Prado
PLAN MOD** Received one set structural calcs, elevation cert and two sets revised plan sheets; Plan stamped and taken back to SRZ for review
Plan assigned to (SRZ)6/16/20146/16/20146/30/2014 DONE
DetailsSam Zahorka
1st review completed.
Routing - PLAN CHECK6/30/2014 6/30/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/30/2014 DONE
DetailsSam Zahorka
Issue and Courier  6/30/2014 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK6/18/2014 6/23/2014 FAIL
DetailsSam Zahorka
1st review completed  6/23/2014 DONE
DetailsSam Zahorka
Routing - Mechanical Review6/16/2014 6/18/2014 PASS
DetailsTroy James
Application received  6/13/2014 DONE