GCB-Final | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PASS |
Dave Hannah
|
|
|
Aaron ###-#### - gate: 0955
|
GCB-Final | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | FAIL |
Mike Jordan
|
|
|
Final - please call Aaron ###-#### before, he would like to meet on site. Gate #0955. Need to insulate crawl space, verify co detector.
|
GCB-Energy | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | PASS |
Jim Sly
|
|
|
Aaron ###-#### call for gate code if needed FRAME AND ENERGY CODE PASS.
|
GCB-Energy | 10/3/2014 | 10/6/2014 | 10/6/2014 | A | FAIL |
Phil Shearer
|
|
|
CN posted
|
GCB-Energy | 9/30/2014 | 9/30/2014 | 10/1/2014 | P | PART |
Dave Hannah
|
|
|
Aaron ###-#### ok to insulate air seal package ok
|
GCB-Framing | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PASS |
Dave Hannah
|
|
|
Erin 4843653
|
GCB-Shearwall | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Jim Sly
|
|
|
Aaron ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/28/2014 | 7/29/2014 | 7/29/2014 | P | PASS |
Dave Hannah
|
|
|
Sean ###-#### pour at 3PM call for gate code if needed
|
GCB-Footing | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Mike Jordan
|
|
|
Aaron ###-#### gate #0955
|
Plan assigned to (SRZ) | 6/30/2014 | 6/30/2014 | 7/9/2014 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/2/2014 | | 7/9/2014 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 7/9/2014 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2014 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 7/9/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Mechanical Review | 6/30/2014 | | 7/2/2014 | | PASS |
Troy James
|
|
|
ductless mini split system per contractor
|
Application received | | | 6/26/2014 | | DONE |
|
|
|
|