Description
(Lot 15 Townhome) - To construct a new 1,957 square foot, Two story, Four bedroom, two and a half bathroom, single family dwelling townhouse with a 416 square foot attached garage, a 48 square foot covered front patio, and a 48 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/24/201511/25/201511/25/2015APASS
DetailsDave Hannah
Dan ###-####
PER LAST FINAL INSP:
GCB-Final 11/19/2015 11/19/2015 11/19/2015 P PEND
DetailsDave Hannah
ok after blower door test passes
GCB-Final11/19/201511/19/201511/19/2015PPEND
DetailsDave Hannah
Dan ###-####ok after blower door test passes
GCB-Final11/13/201511/16/201511/16/2015ANR
DetailsDave Hannah
Dan ###-####
GCB-Energy8/12/20158/13/20158/13/2015APASS
DetailsDave Hannah
Dan ###-####
GCB-Framing8/10/20158/11/20158/11/2015PPASS
DetailsJim Sly
Dan ###-####
GCB-Shearwall7/16/20157/17/20157/17/2015APASS
DetailsDave Hannah
Dan ###-####
GCB-Fndatn/slab ins/fld vent4/22/20154/22/20154/23/2015PPASS
DetailsDave Hannah
Heron ###-####
GCB-Footing4/20/20154/21/20154/21/2015PPASS
DetailsDave Hannah
Contractor ###-#### - requested 4p.m. insp.
Issue and Courier  7/21/2014 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)7/8/20147/8/20147/18/2014 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/11/2014 7/18/2014 PASS
DetailsSam Zahorka
1st review completed  7/18/2014 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/18/2014 DONE
DetailsSam Zahorka
Routing - Mechanical Review7/8/2014 7/11/2014 PASS
DetailsTroy James
Application received  7/7/2014 DONE