Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberGCB14-00105
StatusFinaled
Name French Homes Inc.
Site Address 478 E 51ST
Project NameBLD2014-00105
Customer Number 
ePlanReviewNo
Description
(Lot 10 Townhome) - To construct a new 1,613 square foot, Two story, (598 sq.ft. 1st Story / 1,015 sq.ft. 2nd Story), Four bedroom, two and a half bathroom, single family dwelling townhouse with a 390 square foot attached garage, a 48 square foot covered front patio, and a 48 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final4/3/20154/3/20154/3/2015PPASS
DetailsDave Hannah
Dan ###-####
GCB-Energy1/26/20151/26/20151/26/2015PPASS
DetailsDave Hannah
Dan ###-####
GCB-Framing1/21/20151/22/20151/22/2015APASS
DetailsMike Jordan
Dan ###-####
Plan resubmittals requested  1/15/2015 DONE
new manual j report
Routing - Mechanical Review1/15/2015 1/15/2015 PASS
DetailsTroy James
resubmitted manual j report
GCB-Fire Wall10/14/201410/14/201410/15/2014PPART
DetailsDave Hannah
Dan ###-#### crews working upper walls
GCB-Shearwall10/13/201410/13/201410/14/2014PPASS
DetailsDave Hannah
Dan ###-####
GCB-Shearwall9/30/20149/30/20149/30/2014AFAIL
DetailsDave Hannah
Dan French ###-####
GCB-Fire Wall9/17/20149/17/20149/17/2014PPART
DetailsDave Hannah
Dan 6023255 first floor first layer of sheetrock ok to cover with second layer.
GCB-Fndatn/slab ins/fld vent8/13/20148/13/20148/13/2014PPASS
DetailsDave Hannah
PM foundation inspection requested ###-####
GCB-Footing8/12/20148/12/20148/13/2014PDONE
DetailsDave Hannah
Huron ###-####
GCB-Footing8/12/20148/13/20148/13/2014ACANC
DetailsJim Sly
Huron ###-####
Plan assigned to (SRZ)7/22/20147/22/20148/5/2014 DONE
DetailsSam Zahorka
New single family home
Routing - PLAN CHECK7/24/2014 8/5/2014 PASS
DetailsSam Zahorka
1st review completed  8/5/2014 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  8/5/2014 DONE
DetailsSam Zahorka
Issue and Courier  8/5/2014 DONE
DetailsChristina Prado
Routing - Mechanical Review7/22/2014 7/24/2014 PASS
DetailsTroy James
Application received  7/21/2014 DONE