Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB14-00124
StatusIssued
Name MATTHEW WITT
Site Address 8241 W STATE ST
Project NameBLD2014-00125
Customer Number 
ePlanReviewNo
Description
Treasure Valley Collision Center - **1/2/2015 PLAN MODIFICATION CHANGING THE TYPE OF CONSTRUCTION TO V-B PER ARCHITECTS NEW ANALYSIS. SRZ** To construct a new 4,765 square foot, one story, pre-manufactured steel building for a motor vehicle repair facility. Work to include: Construct the foundation and the engineered metal building; construct interior non-bearing partition walls to divide this space into a service area, break room, and single user restroom; install a service sink; related interior finishes in compliance with chapter 8 of the 2012 IBC; plumbing, mechanical, and electrical work. All work per the approved plans, attached plan review report, and all adopted codes. All equipment shall be listed and labeled per the adopted Electrical Code with approval from the Electrical Inspection section. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/21/20151/22/20151/22/2015AFAIL
DetailsTroy Cobbley
Could not make contact with contractor on site. Could not find approved drawings. Left message on contractors phone. Call prior to going Phone #: 2088701943 >> Cou Kyle Cooper
GCB-Final1/20/20151/21/20151/21/2015APASS
DetailsDave Hannah
Kyle ###-####
CHANGE STATUS TO (ISS)  1/21/2015 DONE
DetailsCandy A. Nichols
was finaled w/o fire life safety inspe being done
GCB-Final1/16/20151/20/20151/20/2015APEND
DetailsDave Hannah
Kyle ###-#### needs to change door hardwear on restroom and break room
Plan assigned to (SRZ)1/2/20151/2/20151/5/2015 DONE
DetailsSam Zahorka
Plan modification.
Routing - PLAN CHECK1/2/2015 1/5/2015 PASS
DetailsSam Zahorka
Plan modification to change the type of construction. combustible framing for the interior wall partitions was identified by the inspector. The architect provided a new building analysis classifying this building to be Type VB. Letter is attached under documents folder.
PLANS/APPL TAKEN TO FRONT DESK  1/5/2015 DONE
DetailsSam Zahorka
Telephone call  1/2/2015 DONE
DetailsSam Zahorka
Left a message for the architect to call me concerning the change of Type of construction due to combustible framing of the interior walls. waiting for a call back.
Plan resubmittals received  1/2/2015 DONE
DetailsChristina Prado
Received plan mod request
GCB-Framing12/31/201412/31/201412/31/2014PPART
DetailsMike Jordan
Kyle ###-####. Per contractor, the architect has reclassified building as type 3 building. Will resubmit as plan mod for approval. Framing is ok.
GCB-Framing12/30/201412/30/201412/30/2014PFAIL
DetailsMike Jordan
Kyle ###-#### - requested call ahead. Noted type 2B construction for building. Interior framing for breakroom and unisex restroom constructed from wood studs. Correction notice issued to have contractor replace framing with non combustible framing or have architect see if building can be reclassified as type VB or type 3. Correction notice issued.
GCB-Framing12/16/201412/17/201412/17/2014ANR
DetailsDave Hannah
Kyle ###-####
GCB-Footing10/24/201410/27/201410/30/2014PPEND
DetailsDave Hannah
Kyle ###-#### contractor requested 1PM needs spec inspection
Routing Off Site - STRUCTURAL10/20/2014 10/23/2014 PASS
DetailsCandy A. Nichols
PLANS/APPL TAKEN TO FRONT DESK  10/23/2014 DONE
DetailsSam Zahorka
Issue and Courier  10/23/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (SRZ)9/2/2014 10/23/2014 DONE
DetailsSam Zahorka
Pending Structural to PASS. 1st review completed.
Routing - PLAN CHECK10/15/2014 10/23/2014 PASS
DetailsSam Zahorka
Pending mechanical and structural review to pass.
Plan resubmittals received  10/16/2014 DONE
DetailsCandy A. Nichols
received from Action Courier- 2 each-R&M Steel Co Engeering, Stapley Eng Calcs, sheets-1-19-took to Sam
Routing - Mechanical Review10/15/2014 10/15/2014 PASS
DetailsTroy James
Mechanical resubmittals routed to Mechanical review.
Plan resubmittals received  10/14/2014 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked M101 & M102 and two revised sets of plans marked SP1.0 & C1.0;Plans stamped and taken to Sam Zahorka for review
Routing Off Site - STRUCTURAL9/29/2014 10/14/2014 FAIL
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL10/3/2014 10/14/2014 FAIL
DetailsJason Blais
Forwarded structural review comments to Matt Witt to have addressed.
Routing - FIRE10/3/201410/3/201410/6/2014 PASS
DetailsCraig D. Hanson
See Fire Plan review Rev 1 10-06-14
Routing - PLAN CHECK9/18/2014 10/3/2014 PASS
DetailsSam Zahorka
Plan resubmittals received  10/1/2014 DONE
DetailsChristina Prado
Received anothe set of structural calcs;Taken to SamZahorka for review
Plan resubmittals received  9/29/2014 DONE
DetailsSam Zahorka
Also received engineered metal building drawings and calculations.
Plan resubmittals received  9/26/2014 DONE
DetailsChristina Prado
Received four sets of revised plan sheets marked T1.0, C1.0, S0.1, S1.1, S5.1, S5.2, A6.0, M101 & M102, as well as one response letter from Architect;Plans stamped and taken to Sam Zahorka for further review
1st review completed  9/18/2014 DONE
Failed: Plan Check, Fire, Mechanical
Routing - FIRE9/17/2014 9/18/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 09-18-14
Routing - PLAN CHECK9/3/2014 9/15/2014 FAIL
DetailsSam Zahorka
No Structural building plans or calculations submitted for review.
Routing - Public Works9/2/20149/2/20149/3/2014 PASS
DetailsBeverly Mountain
Routing - Mechanical Review9/3/2014 9/3/2014 FAIL
DetailsTroy James
emailed corrections to applicant
Application received  8/28/2014 DONE
via Garden City Web Service