FIRE-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | FAIL |
Troy Cobbley
|
|
|
Could not make contact with contractor on site. Could not find approved drawings. Left message on contractors phone. Call prior to going Phone #: 2088701943 >> Cou Kyle Cooper
|
GCB-Final | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | PASS |
Dave Hannah
|
|
|
Kyle ###-####
|
CHANGE STATUS TO (ISS) | | | 1/21/2015 | | DONE |
Candy A. Nichols
|
|
|
was finaled w/o fire life safety inspe being done
|
GCB-Final | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | PEND |
Dave Hannah
|
|
|
Kyle ###-#### needs to change door hardwear on restroom and break room
|
Plan assigned to (SRZ) | 1/2/2015 | 1/2/2015 | 1/5/2015 | | DONE |
Sam Zahorka
|
|
|
Plan modification.
|
Routing - PLAN CHECK | 1/2/2015 | | 1/5/2015 | | PASS |
Sam Zahorka
|
|
|
Plan modification to change the type of construction. combustible framing for the interior wall partitions was identified by the inspector. The architect provided a new building analysis classifying this building to be Type VB. Letter is attached under documents folder.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2015 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 1/2/2015 | | DONE |
Sam Zahorka
|
|
|
Left a message for the architect to call me concerning the change of Type of construction due to combustible framing of the interior walls. waiting for a call back.
|
Plan resubmittals received | | | 1/2/2015 | | DONE |
Christina Prado
|
|
|
Received plan mod request
|
GCB-Framing | 12/31/2014 | 12/31/2014 | 12/31/2014 | P | PART |
Mike Jordan
|
|
|
Kyle ###-####. Per contractor, the architect has reclassified building as type 3 building. Will resubmit as plan mod for approval. Framing is ok.
|
GCB-Framing | 12/30/2014 | 12/30/2014 | 12/30/2014 | P | FAIL |
Mike Jordan
|
|
|
Kyle ###-#### - requested call ahead. Noted type 2B construction for building. Interior framing for breakroom and unisex restroom constructed from wood studs. Correction notice issued to have contractor replace framing with non combustible framing or have architect see if building can be reclassified as type VB or type 3. Correction notice issued.
|
GCB-Framing | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | NR |
Dave Hannah
|
|
|
Kyle ###-####
|
GCB-Footing | 10/24/2014 | 10/27/2014 | 10/30/2014 | P | PEND |
Dave Hannah
|
|
|
Kyle ###-#### contractor requested 1PM needs spec inspection
|
Routing Off Site - STRUCTURAL | 10/20/2014 | | 10/23/2014 | | PASS |
Candy A. Nichols
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2014 | | DONE |
Sam Zahorka
|
|
|
|
Issue and Courier | | | 10/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (SRZ) | 9/2/2014 | | 10/23/2014 | | DONE |
Sam Zahorka
|
|
|
Pending Structural to PASS. 1st review completed.
|
Routing - PLAN CHECK | 10/15/2014 | | 10/23/2014 | | PASS |
Sam Zahorka
|
|
|
Pending mechanical and structural review to pass.
|
Plan resubmittals received | | | 10/16/2014 | | DONE |
Candy A. Nichols
|
|
|
received from Action Courier- 2 each-R&M Steel Co Engeering, Stapley Eng Calcs, sheets-1-19-took to Sam
|
Routing - Mechanical Review | 10/15/2014 | | 10/15/2014 | | PASS |
Troy James
|
|
|
Mechanical resubmittals routed to Mechanical review.
|
Plan resubmittals received | | | 10/14/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plan sheets marked M101 & M102 and two revised sets of plans marked SP1.0 & C1.0;Plans stamped and taken to Sam Zahorka for review
|
Routing Off Site - STRUCTURAL | 9/29/2014 | | 10/14/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/3/2014 | | 10/14/2014 | | FAIL |
Jason Blais
|
|
|
Forwarded structural review comments to Matt Witt to have addressed.
|
Routing - FIRE | 10/3/2014 | 10/3/2014 | 10/6/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan review Rev 1 10-06-14
|
Routing - PLAN CHECK | 9/18/2014 | | 10/3/2014 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 10/1/2014 | | DONE |
Christina Prado
|
|
|
Received anothe set of structural calcs;Taken to SamZahorka for review
|
Plan resubmittals received | | | 9/29/2014 | | DONE |
Sam Zahorka
|
|
|
Also received engineered metal building drawings and calculations.
|
Plan resubmittals received | | | 9/26/2014 | | DONE |
Christina Prado
|
|
|
Received four sets of revised plan sheets marked T1.0, C1.0, S0.1, S1.1, S5.1, S5.2, A6.0, M101 & M102, as well as one response letter from Architect;Plans stamped and taken to Sam Zahorka for further review
|
1st review completed | | | 9/18/2014 | | DONE |
|
|
|
Failed: Plan Check, Fire, Mechanical
|
Routing - FIRE | 9/17/2014 | | 9/18/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-18-14
|
Routing - PLAN CHECK | 9/3/2014 | | 9/15/2014 | | FAIL |
Sam Zahorka
|
|
|
No Structural building plans or calculations submitted for review.
|
Routing - Public Works | 9/2/2014 | 9/2/2014 | 9/3/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Mechanical Review | 9/3/2014 | | 9/3/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to applicant
|
Application received | | | 8/28/2014 | | DONE |
|
|
|
via Garden City Web Service
|