Permit NumberGCB14-00141
StatusFinaled
Name JOHN P PRICE
Site Address 108 W 33RD ST
Project NameBLD2014-00142
Customer Number 
ePlanReviewNo
Description
(SIMPLY LEDS) - To remodel an existing 10,363 square foot building for this tenant per plans. Work to include: Demolition of existing office and mezzanine spaces; construct new interior walls to create new accessible restrooms, new offices, break room, janitor room, inventory room, open office room, and storage room; install a new 3-hour overhead door in an existing 4-hour Fire wall; a service sink; related interior finishes in compliance with chapter 8 of the 2012 IBC; complete HVAC, plumbing, and electrical systems; and all other work per the approved plans, attached plan review report, and adopted codes. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final2/26/20152/26/20152/26/2015PPASS
DetailsDave Hannah
Robert ###-####
GCB-Final2/23/20152/23/20152/24/2015PPART
DetailsDave Hannah
Zack ###-#### needs fire final and fix ada issues
FIRE-Final Inspection2/23/20152/23/20152/23/2015PPASS
DetailsScott Arellano
Call prior to going Phone #: ###-#### >> Inspection requested via mobile web by Zack Caper

3 hour fire door not installed. Infilled opening within 4 hour fire wall to be approved by structural inspector.
GCB-Framing12/17/201412/17/201412/18/2014PPASS
DetailsDave Hannah
Zack ###-#### - cover insp.
GCB-Framing12/16/201412/16/201412/16/2014PFAIL
DetailsDave Hannah
Brian ###-#### - access at corner of 34th and Brown needs to fire block wall and fur downs
Plan assigned to (SRZ)11/4/201411/4/201411/10/2014 DONE
DetailsSam Zahorka
Pending Statement for Special Inspections
CHANGE STATUS TO (ISS)  11/10/2014 DONE
DetailsSam Zahorka
CHANGE STATUS TO (REV)  11/4/2014 DONE
DetailsSam Zahorka
Waiting for a Statement for Special Inspection
Plan assigned to (SRZ) 9/22/201410/31/2014 DONE
DetailsSam Zahorka
2nd review completed.
Routing - PLAN CHECK10/15/2014 10/31/2014 FAIL
DetailsSam Zahorka
Pending accessible upgrade letter from the architect.
Routing - PLAN CHECK10/31/2014 10/31/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  10/31/2014 DONE
DetailsSam Zahorka
Issue and Courier  10/31/2014 DONE
DetailsChristina Prado
Plan resubmittals received  10/28/2014 DONE
DetailsCandy A. Nichols
received from GC by courier 1 response letter from TAO Architects and 2 sets of sheet # A.00, A2.0, A2.1, A2.2, A2.3, A4.0, A6.0, A7.0, M1.0, M2.0,& M3.0- took tof Sam Z
1st review completed  10/15/2014 DONE
Failed: Plan Check
Routing - FIRE10/10/2014 10/15/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 10-15-14
Routing - PLAN CHECK10/1/2014 10/10/2014 FAIL
DetailsSam Zahorka
Routing - Mechanical Review9/24/2014 10/1/2014 PASS
DetailsTroy James
Plan resubmittals received  9/30/2014 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked M1.0, M2.0 & M3.0;Plans stamped and taken to Sam Zahorka for review
Routing - Public Works9/22/20149/22/20149/24/2014 PASS
DetailsBeverly Mountain
Application received  9/22/2014 DONE
via Garden City Web Service