Permit Information
Permit NumberGCB15-00016
StatusFinaled
Name WILLIAM D HURLEY
Site Address 7319 W STATE ST
Project NameBLD2015-00016
Customer Number 
ePlanReviewNo
Description
(Walmart Remodel - Store # 2861) PLAN MODIFICATION #2 CONSISTING OF IN THE AREA OF THE GAMEPLAY/SPORTS SECTION AS WELL AD LIGHTING AND SKYLIGHT MODIFICATIONS. PLAN MODIFICATION # 1 INDICATING AN EXPANDED AREA OF DEMOLITION TO INCLUDE GAME AND CUSTOMER SERVICE AREAS REMOVAL AND REPLACEMENT OF AN EXISTING COOLER AND MINOR RACK RELOCATION. **CDM** To remodel the interior and exterior of an existing 201,974 square foot retail store. Work to include: Demolition work per plans; remodel the existing customer rear and front men's and women's restrooms; install new doors at the vestibule locations, cart storage, seasonal shop and Garden Center glazed canopy; installation of new flooring finishes; new lighting, mechanical and plumbing work; new accessible counters; install new exhaust fan on the roof; interior finishes in compliance with chapter 8 of the 2012 IBC; exterior changes include new paint, signage, and exterior site improvements; relocate and install new racking per locations on plans and engineering - SPECIAL INSPECTIONS ARE REQUIRED FOR ANCHORAGE; and all other work per the approved plans, attached plan review report, and adopted codes. A certificate of completion shall be issued when work is completed and a final inspection has occurred. This building is Fire Sprinklered for unlimited area and has an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/17/201511/17/201511/17/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection11/16/201511/17/201511/17/2015APASS
DetailsTroy Cobbley
Life safety passed
GCB-Final9/18/20159/21/20159/21/2015PNR
DetailsMike Jordan
Ashley ###-#### - partial final. Fire/life/safety failed.
FIRE-Final Inspection9/18/20159/21/20159/21/2015AFAIL
DetailsTroy Cobbley
Provide missing exit signs and emergency lights and repair or replace all non-functional lights. Hange fire extinguisher in the Pharmacy.
GCB-Final9/18/20159/18/20159/18/2015PCANC
DetailsPhil Shearer
Ashley ###-####
GCB-Ceiling Grid8/3/20158/4/20158/4/2015APASS
DetailsMike Jordan
Ashley ###-####
Plan assigned to (CDM)7/16/20157/16/20158/3/2015 DONE
DetailsCarl D Madsen
Routing - PLAN CHECK7/16/2015 7/31/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/31/2015 DONE
Issue and Courier  7/31/2015 DONE
DetailsChristina Prado
Plans approved and sent to Garden City
GCB-Ceiling Grid7/29/20157/30/20157/30/2015ANR
DetailsDave Hannah
Ashley ###-####
GCB-Framing7/16/20157/17/20157/17/2015APASS
DetailsDave Hannah
Jerry ###-####
Plan resubmittals received  7/16/2015 DONE
plan mod received 3 sets of C1, D1, A1, A1.2, A3, A4, A5, A7, MP1, M1, E1, E1.1, E2, E2.1, E4, EM1, GE1, Letter from PB2 architect/engineering-took to Carl M
Plan assigned to (CDM)6/23/20156/23/20156/24/2015 DONE
DetailsCarl D Madsen
Routing - PLAN CHECK6/23/2015 6/24/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/24/2015 DONE
Issue and Courier  6/24/2015 DONE
Plan resubmittals received  6/23/2015 DONE
plan mod received-received 3 sets of response letter, anchorage calcs, table of contents, and sheets C1, N1, D1, A1, A1.1, A1.2, A5, A7, GA1, GA2, FP1, FP2, MP1, M1, R1, R2, R3, E1, E1.1, E2, E2.1, EM1, RE1, REM1, REM1.1, FXS1, FXS2, FXS3-took to Carl M
GCB-Courtesy6/12/20156/15/20156/15/2015APASS
DetailsDave Hannah
Jerry ###-#### - requested call ahead. Go to back of store to trailer office
Plan assigned to (SRZ) 2/23/20153/18/2015 DONE
DetailsSam Zahorka
1st review completed.
Routing - PLAN CHECK3/4/2015 3/18/2015 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  3/18/2015 DONE
DetailsSam Zahorka
Issue and Courier  3/18/2015 DONE
DetailsCandy A. Nichols
Plan resubmittals received  3/16/2015 DONE
DetailsCandy A. Nichols
resubmittals received 3 each sheet N1, D1, A1, A1.1, A1.2, A2, A5, A5.1, A7, GA1, MP1, E1, E1.1, E2, E2.1, FXS1-1 set each statement of special inspections & 1 set of revisions-took to Sam Z
Routing - FIRE3/3/20152/23/20153/4/2015 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  3/4/2015 DONE
DetailsSam Zahorka
Routing - PLAN CHECK2/25/2015 3/3/2015 FAIL
DetailsSam Zahorka
Routing - Mechanical Review2/24/2015 2/25/2015 PASS
DetailsTroy James
Routing - Public Works2/23/20152/23/20152/24/2015 PASS
DetailsBeverly Mountain
Application received  2/20/2015 DONE
via Garden City Web Service